Climax Molybdenum Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electrical conductors.
HENDERSON OPERATIONS · 050079030 CFR 57.12004 · $151.00 proposed penalty
Handrails and toeboards.
HENDERSON OPERATIONS · 050079030 CFR 57.11002 · Significant and substantial (S&S) · $883.00 proposed penalty
Inspection and cover plates.
HENDERSON OPERATIONS · 050079030 CFR 57.12032 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Berms or guardrails.
HENDERSON OPERATIONS · 050079030 CFR 57.9300(d)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Warning signs.
HENDERSON OPERATIONS · 050079030 CFR 57.4101 · $177.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(a)(1) · $267.00 proposed penalty
General requirements.
HENDERSON OPERATIONS · 050079030 CFR 57.4200(b)(2) · $267.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(b) · $177.00 proposed penalty
Blocking equipment in a raised position.
HENDERSON OPERATIONS · 050079030 CFR 57.14211(c) · $177.00 proposed penalty
Combustible waste.
HENDERSON OPERATIONS · 050079030 CFR 57.4104(b)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $1,037.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $336.00 proposed penalty
Machinery, equipment, and tools.
HENDERSON OPERATIONS · 050079030 CFR 57.14205 · $267.00 proposed penalty
Escape and evacuation plans.
HENDERSON OPERATIONS · 050079030 CFR 57.11053(a) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
HENDERSON OPERATIONS · 050079030 CFR 57.12019 · $177.00 proposed penalty
Safety defects; examination, correction and records.
Climax Mine · 050225630 CFR 56.14100 · $398.00 proposed penalty
Regular Safety and Health Inspection
HENDERSON OPERATIONS · 0500790265.3 on-site hours reported
Regular Safety and Health Inspection
Climax Mine · 0502256140.3 on-site hours reported
Handling of materials
Climax Mine · 0502256Days away from work only
Accident narrative
Employee states lower back and shoulder discomfort from lifting spilled grinding media that weighed up to 24lb.
Slip or fall of person
Climax Mine · 0502256Days away from work only
Accident narrative
Employee stepped from the engine hood cover to the cab access platform and sprained right ankle.
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $151.00 proposed penalty
Berms or guardrails.
HENDERSON OPERATIONS · 050079030 CFR 57.9300(d)(1) · $642.00 proposed penalty
Berms or guardrails.
HENDERSON OPERATIONS · 050079030 CFR 57.9300(d)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Moving machine parts.
HENDERSON OPERATIONS · 050079030 CFR 57.14107(a) · $288.00 proposed penalty
Requirement for container labels.
HENDERSON OPERATIONS · 050079030 CFR 47.41(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.