Climax Molybdenum Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(b) · $288.00 proposed penalty
Snow and ice on walkways and travelways.
HENDERSON OPERATIONS · 050079030 CFR 57.11016 · Significant and substantial (S&S) · $959.00 proposed penalty
Impoundment Spot Inspection
Climax Mine · 05022565.0 on-site hours reported
Moving machine parts.
HENDERSON OPERATIONS · 050079030 CFR 57.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Moving machine parts.
HENDERSON OPERATIONS · 050079030 CFR 57.14107(a) · $288.00 proposed penalty
Safe access.
HENDERSON OPERATIONS · 050079030 CFR 57.11001 · $193.00 proposed penalty
First aid materials.
HENDERSON OPERATIONS · 050079030 CFR 57.15001 · $193.00 proposed penalty
Combustible waste.
HENDERSON OPERATIONS · 050079030 CFR 57.4104(a) · $193.00 proposed penalty
Ventilation plan.
HENDERSON OPERATIONS · 050079030 CFR 57.8520(e) · $151.00 proposed penalty
Illumination of surface working areas.
HENDERSON OPERATIONS · 050079030 CFR 57.17001 · $642.00 proposed penalty
Protection for openings around travelways.
HENDERSON OPERATIONS · 050079030 CFR 57.11012 · $288.00 proposed penalty
Identification of power switches.
HENDERSON OPERATIONS · 050079030 CFR 57.12018 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Impoundment Spot Inspection
HENDERSON OPERATIONS · 05007905.0 on-site hours reported
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(a)(1) · $288.00 proposed penalty
Storage of hazardous materials.
HENDERSON OPERATIONS · 050079030 CFR 57.16003 · $193.00 proposed penalty
Snow and ice on walkways and travelways.
HENDERSON OPERATIONS · 050079030 CFR 57.11016 · $193.00 proposed penalty
Battery-charging stations.
HENDERSON OPERATIONS · 050079030 CFR 57.4502(c) · $288.00 proposed penalty
Safe access.
HENDERSON OPERATIONS · 050079030 CFR 57.11001 · $193.00 proposed penalty
Electrical conductors.
HENDERSON OPERATIONS · 050079030 CFR 57.12004 · $226.00 proposed penalty
Snow and ice on walkways and travelways.
HENDERSON OPERATIONS · 050079030 CFR 57.11016 · $226.00 proposed penalty
Examination of working places.
HENDERSON OPERATIONS · 050079030 CFR 57.18002(b) · $209.00 proposed penalty
Protection for openings around travelways.
HENDERSON OPERATIONS · 050079030 CFR 56.11012 · $226.00 proposed penalty
Protection of gas cylinder valves.
HENDERSON OPERATIONS · 050079030 CFR 57.16006 · $755.00 proposed penalty
Combustible waste.
HENDERSON OPERATIONS · 050079030 CFR 57.4104(a) · $226.00 proposed penalty
Protection of gas cylinder valves.
HENDERSON OPERATIONS · 050079030 CFR 57.16006 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.