Protection for openings around travelways.
Demopolis Plant Cemex Inc · 010001630 CFR 56.11012 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Inspection and cover plates.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12032 · $592.00 proposed penalty
Construction and maintenance of guards.
Demopolis Plant Cemex Inc · 010001630 CFR 56.14112(b) · $592.00 proposed penalty
Inspection and cover plates.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12032 · $592.00 proposed penalty
Identification of power switches.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12018 · $592.00 proposed penalty
Controls and switches.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12002 · $267.00 proposed penalty
Inspection and cover plates.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12032 · $592.00 proposed penalty
Regular Safety and Health Inspection
Demopolis Plant Cemex Inc · 010001627.8 on-site hours reported
Special Emphasis Programs
Demopolis Plant Cemex Inc · 01000161.0 on-site hours reported
Housekeeping.
Clinchfield Plant · 090005330 CFR 56.20003(a) · $398.00 proposed penalty
Safe access.
Clinchfield Plant · 090005330 CFR 56.11001 · Significant and substantial (S&S) · $883.00 proposed penalty
Guarding around lights.
Clinchfield Plant · 090005330 CFR 56.12034 · $165.00 proposed penalty
Flying or falling materials.
Clinchfield Plant · 090005330 CFR 56.14110 · $549.00 proposed penalty
Examination of working places.
Clinchfield Plant · 090005330 CFR 56.18002(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Inspection and cover plates.
Clinchfield Plant · 090005330 CFR 56.12032 · $1,219.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Clinchfield Plant · 090005330 CFR 56.14109(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Flying or falling materials.
Clinchfield Plant · 090005330 CFR 56.14110 · $697.00 proposed penalty
High-pressure hose connections.
Clinchfield Plant · 090005330 CFR 56.13021 · $209.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Clinchfield Plant · 090005330 CFR 56.14109(a) · $209.00 proposed penalty
Regular Safety and Health Inspection
Clinchfield Plant · 090005363.5 on-site hours reported
Spot Inspection
Clinchfield Plant · 09000532.0 on-site hours reported
Slip or fall of person
Demopolis Plant Cemex Inc · 0100016Days restricted activity only
Accident narrative
Employee was walking through the clinker storage shed and while doing so walked across a spot of unlevel ground and slipped on some loose clinker, folding EE's right ankle underneath EE and landing on EE's right shoulder causing pain to both the ankle and shoulder. EE's right fibula was fractured.
Verbal Hazard Complaint Inspections
Clinchfield Plant · 09000533.8 on-site hours reported
Electrical conductors.
Demopolis Plant Cemex Inc · 010001630 CFR 56.12004 · $2,712.00 proposed penalty
Illumination of surface working areas.
Demopolis Plant Cemex Inc · 010001630 CFR 56.17001 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.