ACTIVE / OPERATOR PORTFOLIO

Cemex Southeast LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0118327

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Clinchfield Plant0900053 · Active6/8 quarters reportedHouston, GAFacility · MSHA: Cement0568,909763280.3
Demopolis Plant Cemex Inc0100016 · Active6/8 quarters reportedMarengo, ALFacility · MSHA: Cement0437,22721782.0

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

97

23 significant & substantial (S&S)

  1. 2025 Q119
  2. 2025 Q215
  3. 2025 Q30
  4. 2025 Q47
  5. 2026 Q121
  6. 2026 Q223
  7. 2026 Q312
  8. 2026 Q4 *0

Accident records

10

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q13
  6. 2026 Q21
  7. 2026 Q34
  8. 2026 Q4 *0

Proposed penalties · USD

83,413.00

97 of 97 violations with amounts

  1. 2025 Q125,703
  2. 2025 Q221,046
  3. 2025 Q3—
  4. 2025 Q46,163
  5. 2026 Q111,595
  6. 2026 Q212,199
  7. 2026 Q36,707
  8. 2026 Q4 *—

On-site inspection hours

362.25

20 inspections · 20 with hours

  1. 2025 Q184.50
  2. 2025 Q292.00
  3. 2025 Q31.00
  4. 2025 Q434.00
  5. 2026 Q157.25
  6. 2026 Q284.50
  7. 2026 Q39.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1191225,703.0010484.5
2025-Q215421,046.0010492.0
2025-Q300—0011.0
2025-Q4716,163.0000234.0
2026-Q121111,595.0030457.3
2026-Q223312,199.0010284.5
2026-Q31226,707.004039.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF042602
    Clinchfield Plant · 0900053

    Spot Inspection · 2.0 on-site hours

  2. accident220262530008
    Demopolis Plant Cemex Inc · 0100016

    HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    Employee was removing a dust collector cartridge from a baghouse and felt discomfort in EE's lower back area.

  3. inspectionF039216
    Clinchfield Plant · 0900053

    Spot Inspection · 5.0 on-site hours

  4. inspectionF015427
    Clinchfield Plant · 0900053

    Spot Inspection · 2.0 on-site hours

  5. violation9709196
    Clinchfield Plant · 0900053

    56.16002(a) · S&S · $2,503.00 proposed

  6. accident220261950044
    Clinchfield Plant · 0900053

    MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Employee was getting ready for lunch when they felt something in their right eye, the employee was to the bathroom to flush eye out but was not able to get the material out of their eye. the employee was taken to a clinic where the material come out on its own. The employee was prescribed eye drops.

  7. accident220262010011
    Demopolis Plant Cemex Inc · 0100016

    HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was using a hammer to drive a pin out of a piece of equipment and smashed their right index finger while striking the pin.

  8. violation9759755
    Clinchfield Plant · 0900053

    56.12018 · $226.00 proposed

  9. accident220262020031
    Clinchfield Plant · 0900053

    OTHER · INJURIES INVOLVNG NONEMPLOYEES

    Accident narrative

    MSHA Inspector was exposed too feed dust during conversation with Cemex employee, MSHA inspector stopped Cemex from preforming their job duties.

  10. violation9759756
    Clinchfield Plant · 0900053

    56.4102 · $267.00 proposed

  11. violation9759754
    Clinchfield Plant · 0900053

    56.4201(a)(1) · $267.00 proposed

  12. violation9759753
    Clinchfield Plant · 0900053

    56.14100(c) · $883.00 proposed

  13. violation9709195
    Clinchfield Plant · 0900053

    56.12020 · $267.00 proposed

  14. violation9709194
    Clinchfield Plant · 0900053

    56.4104(b) · $267.00 proposed

  15. violation9709193
    Clinchfield Plant · 0900053

    56.14107(a) · $267.00 proposed

  16. violation9709192
    Clinchfield Plant · 0900053

    56.18002(b) · $267.00 proposed

  17. violation9709191
    Clinchfield Plant · 0900053

    56.11001 · $267.00 proposed

  18. violation5067208
    Clinchfield Plant · 0900053

    56.9315 · S&S · $959.00 proposed

  19. violation5067205
    Clinchfield Plant · 0900053

    56.13021 · $267.00 proposed

  20. violation9759752
    Clinchfield Plant · 0900053

    56.12032 · $313.00 proposed

  21. violation9759750
    Clinchfield Plant · 0900053

    56.9300(a) · S&S · $5,144.00 proposed

  22. violation9759749
    Clinchfield Plant · 0900053

    46.8(a)(2) · $151.00 proposed

  23. violation9709190
    Clinchfield Plant · 0900053

    56.11001 · $313.00 proposed

  24. violation9709189
    Clinchfield Plant · 0900053

    56.12032 · $313.00 proposed

  25. violation9709188
    Clinchfield Plant · 0900053

    56.14107 · S&S · $1,550.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.