CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
SUFCO · 420008930 CFR 75.1731(a) · $313.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(d)(3) · $226.00 proposed penalty
Maintenance of diesel-powered equipment.
SUFCO · 420008930 CFR 75.1914(a) · $226.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $313.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
SUFCO · 420008930 CFR 75.601-1 · $226.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $336.00 proposed penalty
Maintenance of diesel-powered equipment.
SUFCO · 420008930 CFR 75.1914(a) · $226.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
SUFCO · 420008930 CFR 75.503 · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $313.00 proposed penalty
Temporary, portable containers.
SKYLINE MINE #3 · 420156630 CFR 47.44(b) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
SKYLINE MINE #3 · 42015664.0 on-site hours reported
Protection from falls of roof, face and ribs.
SUFCO · 420008930 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
SKYLINE MINE #3 · 420156630 CFR 77.809 · $288.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $313.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $313.00 proposed penalty
Follow-up corrective measures when a standard threshold shift is detected.
SKYLINE MINE #3 · 420156630 CFR 62.174 · Significant and substantial (S&S)
Follow-up corrective measures when a standard threshold shift is detected.
SKYLINE MINE #3 · 420156630 CFR 62.174 · Significant and substantial (S&S)
Follow-up corrective measures when a standard threshold shift is detected.
SKYLINE MINE #3 · 420156630 CFR 62.174 · Significant and substantial (S&S)
Notification of results; reporting requirements.
SKYLINE MINE #3 · 420156630 CFR 62.175(a)(1) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
SUFCO · 420008930 CFR 75.380(d)(4) · $398.00 proposed penalty
Non-Injury Accident Investigation
SKYLINE MINE #3 · 420156645.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.