CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $288.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Underground sanitary facilities; installation and maintenance.
SUFCO · 420008930 CFR 75.1712-6(a) · $226.00 proposed penalty
Drinking water.
SUFCO · 420008930 CFR 75.1718 · $465.00 proposed penalty
Roof control plan.
SUFCO · 420008930 CFR 75.220(a)(1) · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
SUFCO · 420008930 CFR 75.380(d)(1) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Maintenance of incombustible content of rock dust.
SUFCO · 420008930 CFR 75.403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
SUFCO · 420008930 CFR 75.403 · $288.00 proposed penalty
Verbal Hazard Complaint Inspections
SKYLINE MINE #3 · 42015665.5 on-site hours reported
Protection from falls of roof, face and ribs.
SUFCO · 420008930 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Roof control plan.
SUFCO · 420008930 CFR 75.220(a)(1) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
SUFCO · 420008930 CFR 75.380(f)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
SUFCO · 420008930 CFR 75.370(a)(1) · $504.00 proposed penalty
Criteria—Belt conveyors.
SUFCO · 420008930 CFR 75.1403-5(g) · $226.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $398.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $398.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $549.00 proposed penalty
Permissible electric face equipment; maintenance.
SUFCO · 420008930 CFR 75.503 · $226.00 proposed penalty
Regular Safety and Health Inspection
SUFCO · 4200089436.8 on-site hours reported
Regular Safety and Health Inspection
SKYLINE MINE #3 · 4201566431.5 on-site hours reported
Handling of materials
SUFCO · 4200089Days away from work only
Accident narrative
EE was roof bolting mesh to the roof as EE was raising the ATRS to the roof EE noticed that the mesh needed to be adjusted. EE lowered the mesh and was adjusting the mesh when it kicked upwards causing EE's finger to be caught between the mesh and the mat pulling EE's middle finger nail back.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.