CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Underground storage, lubricating oil and grease.
SKYLINE MINE #3 · 420156630 CFR 75.1104 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
SKYLINE MINE #3 · 420156630 CFR 75.370(a)(1) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
SKYLINE MINE #3 · 420156630 CFR 75.370(a)(1) · $398.00 proposed penalty
Regular Safety and Health Inspection
SUFCO · 4200089355.0 on-site hours reported
Regular Safety and Health Inspection
SKYLINE MINE #3 · 4201566494.0 on-site hours reported
Underground storage, lubricating oil and grease.
SKYLINE MINE #3 · 420156630 CFR 75.1104 · $226.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $398.00 proposed penalty
Maintenance of incombustible content of rock dust.
SKYLINE MINE #3 · 420156630 CFR 75.403 · $398.00 proposed penalty
Preshift examination at fixed intervals.
SKYLINE MINE #3 · 420156630 CFR 75.360(g) · $1,037.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Underground storage, lubricating oil and grease.
SKYLINE MINE #3 · 420156630 CFR 75.1104 · $288.00 proposed penalty
Surface installations; general.
SKYLINE MINE #3 · 420156630 CFR 77.200 · $288.00 proposed penalty
Preshift examination at fixed intervals.
SKYLINE MINE #3 · 420156630 CFR 75.360(g) · $398.00 proposed penalty
Handtools (nonpowered)
SUFCO · 4200089Days away from work only
Accident narrative
EE was trying to hook the knuckle to the pan. The draw bar needed to be coma longed into place. There was no D ring on the draw bar so ee hooked the coma long around the draw bar and then hooked the body of the coma long to the canopy. EE instructed another EE to raise the shield as EE was watching the draw bar the chain broke and struck EE in the mouth/nose.
Maintenance of incombustible content of rock dust.
SUFCO · 420008930 CFR 75.403 · $226.00 proposed penalty
Fail safe ground check circuits on high-voltage resistance grounded systems.
SKYLINE MINE #3 · 420156630 CFR 75.803 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Travelways at surface installations.
SKYLINE MINE #3 · 420156630 CFR 77.205(a) · $288.00 proposed penalty
Low-, medium-, or high-voltage distribution circuits and equipment; repair.
SKYLINE MINE #3 · 420156630 CFR 75.511 · Significant and substantial (S&S) · $35,092.00 proposed penalty
Handling of materials
SKYLINE MINE #3 · 4201566Days away from work only
Accident narrative
Employees were loading a butterfly valve onto an underground truck. The valve shifted and accidentally rolled onto employee's hand that was on the bed of the truck. Employee pulled EE's hand out from underneath the valve causing injury to two fingers.
Condition and examination of firefighting equipment.
SKYLINE MINE #3 · 420156630 CFR 75.1100-3 · $151.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
SUFCO · 420008930 CFR 75.1911(i) · $177.00 proposed penalty
Identification of circuit breakers.
SUFCO · 420008930 CFR 75.904 · $177.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
SUFCO · 420008930 CFR 75.1909(e) · $177.00 proposed penalty
Travelways at surface installations.
SKYLINE MINE #3 · 420156630 CFR 77.205(a) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
SKYLINE MINE #3 · 420156630 CFR 75.202(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.