CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preshift examination at fixed intervals.
SKYLINE MINE #3 · 420156630 CFR 75.360(g) · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(a) · $313.00 proposed penalty
Condition and examination of firefighting equipment.
SKYLINE MINE #3 · 420156630 CFR 75.1100-3 · $226.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
SKYLINE MINE #3 · 420156630 CFR 75.370(a)(1) · $1,219.00 proposed penalty
Regular Safety and Health Inspection
CASTLE VALLEY PREP PLANT · 420245510.5 on-site hours reported
Mine ventilation plan; submission and approval.
SKYLINE MINE #3 · 420156630 CFR 75.370(a)(1) · $366.00 proposed penalty
Escapeway maps.
SKYLINE MINE #3 · 420156630 CFR 75.1505(b) · $465.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(a) · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.503 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.512 · $267.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.512 · $267.00 proposed penalty
Maintenance of incombustible content of rock dust.
SUFCO · 420008930 CFR 75.403 · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(a) · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.503 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.503 · $245.00 proposed penalty
Proximity detection systems.
SKYLINE MINE #3 · 420156630 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $755.00 proposed penalty
Handtools (nonpowered)
SUFCO · 4200089No dys awy frm wrk,no rstr act
Accident narrative
EE was removing the CM pot and while trying to pry the pot free the bar slipped and pinched EE's left hand ring finger between the bar and the CLA tip.
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.503 · $245.00 proposed penalty
Other safeguards.
SKYLINE MINE #3 · 420156630 CFR 75.1403 · $226.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Air quality detectors and measurement devices.
SUFCO · 420008930 CFR 75.320(c) · $151.00 proposed penalty
Sampling; general and technical requirements.
SUFCO · 420008930 CFR 70.201(c) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.