CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handling of materials
SUFCO · 4200089Days away from work only
Accident narrative
Employee was helping fix a shuttle car chain. The boom was being lowered and employee saw a shovel. EE reached in to retrieve the shovel and accidentally got EE's other hand pinched by the shuttle car boom causing injury.
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Maintenance of incombustible content of rock dust.
SKYLINE MINE #3 · 420156630 CFR 75.403 · $226.00 proposed penalty
Maintenance of incombustible content of rock dust.
SKYLINE MINE #3 · 420156630 CFR 75.403 · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
SKYLINE MINE #3 · 420156630 CFR 75.1909(d) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
SKYLINE MINE #3 · 420156630 CFR 75.1909(d) · $226.00 proposed penalty
Installation of water sprinkler systems; requirements.
SKYLINE MINE #3 · 420156630 CFR 75.1101-7(b) · $226.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Starting aids.
SKYLINE MINE #3 · 420156630 CFR 75.1913(b) · $226.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
SKYLINE MINE #3 · 420156630 CFR 75.1101-10 · $226.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Preshift examination at fixed intervals.
SKYLINE MINE #3 · 420156630 CFR 75.360(g) · $245.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
SUFCO · 420008930 CFR 75.370(a)(1) · $288.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(a) · $151.00 proposed penalty
Ventilation controls.
SKYLINE MINE #3 · 420156630 CFR 75.333(h) · $366.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Preshift examination at fixed intervals.
SUFCO · 420008930 CFR 75.360(b) · Significant and substantial (S&S) · $13,782.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.