CANYON FUEL COMPANY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
SKYLINE MINE #3 · 420156630 CFR 75.363(a) · $755.00 proposed penalty
Roof bolting.
SKYLINE MINE #3 · 420156630 CFR 75.204(c)(1) · $151.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · Significant and substantial (S&S) · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
SUFCO · 420008930 CFR 75.1731(b) · Significant and substantial (S&S) · $465.00 proposed penalty
Accumulation of combustible materials.
SKYLINE MINE #3 · 420156630 CFR 75.400 · $465.00 proposed penalty
Machinery
SUFCO · 4200089Days away from work only
Accident narrative
While cleaning out dust hopper EE removed the guard and was working on unplugging the hopper when EE dropped EE's knife into the hopper. EE had thought that EE had turned off the hydraulic power and hydraulic lever on the agitator. When reaching into the hopper to get EE's knife the agitator came on and caught EE's right arm between the agitator and dust hopper.
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
SUFCO · 420008930 CFR 75.1909(e) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
SKYLINE MINE #3 · 420156630 CFR 75.370(a)(1) · $165.00 proposed penalty
Cable fittings; suitability.
SUFCO · 420008930 CFR 75.515 · $177.00 proposed penalty
Cable fittings; suitability.
SUFCO · 420008930 CFR 75.515 · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $245.00 proposed penalty
Welding operations.
SUFCO · 420008930 CFR 75.1729 · Significant and substantial (S&S) · $959.00 proposed penalty
Ventilation controls.
SUFCO · 420008930 CFR 75.333(h) · $226.00 proposed penalty
Cable fittings; suitability.
SUFCO · 420008930 CFR 75.515 · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $245.00 proposed penalty
Cable fittings; suitability.
SUFCO · 420008930 CFR 75.515 · $177.00 proposed penalty
Atmospheric monitoring systems.
SKYLINE MINE #3 · 420156630 CFR 75.351(k) · $151.00 proposed penalty
Atmospheric monitoring systems.
SKYLINE MINE #3 · 420156630 CFR 75.351(k) · $226.00 proposed penalty
Atmospheric monitoring systems.
SKYLINE MINE #3 · 420156630 CFR 75.351(k) · $226.00 proposed penalty
Atmospheric monitoring systems.
SKYLINE MINE #3 · 420156630 CFR 75.351(d)(1) · $245.00 proposed penalty
Atmospheric monitoring systems.
SKYLINE MINE #3 · 420156630 CFR 75.351(k) · $245.00 proposed penalty
Accumulation of combustible materials.
SUFCO · 420008930 CFR 75.400 · $336.00 proposed penalty
Inspection of fire suppression devices.
SKYLINE MINE #3 · 420156630 CFR 75.1107-16(b) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.