Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MSHA OPERATOR IDL03563
MINE PORTFOLIO
6 of 6 mines and facilities
2025-01-01 – 2026-10-17. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
Portfolio map
6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.
Database snapshot · 2026-10-17. All 6 mines listed under this operator were checked; 0 have reports in the available quarters. Totals use current ownership.
Coal production
—
reported short tons
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Hours worked
—
reported employee hours
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Tons per hour
—
production ÷ hours worked
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
Quarterly production, employment and reporting coverage for Buechel Stone Corp
Quarter
Coal (short tons)
Hours worked
Tons / hour
Avg. employees
Coverage
2025 Q1
—
—
—
—
No report
2025 Q2
—
—
—
—
No report
2025 Q3
—
—
—
—
No report
2025 Q4
—
—
—
—
No report
2026 Q1
—
—
—
—
No report
2026 Q2
—
—
—
—
No report
2026 Q3
—
—
—
—
No report
2026 Q4
—
—
—
—
No report
Safety and enforcement
2025-01-01 – 2026-10-17
Violations
25
5 significant & substantial (S&S)
2025 Q17
2025 Q20
2025 Q32
2025 Q40
2026 Q19
2026 Q27
2026 Q30
2026 Q4 *0
Accident records
6
0 records classified as fatality
2025 Q12
2025 Q20
2025 Q31
2025 Q40
2026 Q10
2026 Q21
2026 Q32
2026 Q4 *0
Proposed penalties · USD
4,027.00
25 of 25 violations with amounts
2025 Q11,173
2025 Q2—
2025 Q3302
2025 Q4—
2026 Q11,453
2026 Q21,099
2026 Q3—
2026 Q4 *—
On-site inspection hours
118.00
24 inspections · 24 with hours
2025 Q124.50
2025 Q21.50
2025 Q326.75
2025 Q44.50
2026 Q133.75
2026 Q216.75
2026 Q310.25
2026 Q4 *—
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
Quarter
Violations
S&S
Proposed USD
Accident records
Fatality records
Inspections
On-site hours
2025-Q1
7
0
1,173.00
2
0
4
24.5
2025-Q2
0
0
—
0
0
1
1.5
2025-Q3
2
0
302.00
1
0
5
26.8
2025-Q4
0
0
—
0
0
1
4.5
2026-Q1
9
2
1,453.00
0
0
6
33.8
2026-Q2
7
3
1,099.00
1
0
3
16.8
2026-Q3
0
0
—
2
0
4
10.3
2026-Q4 *
0
0
—
0
0
0
—
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
Accident narrative
EE saw a loose piece of stone stack placed on the flatbed trailer. The EE tried to dislodge the broken piece of stone so it would not fall off onto the roadway during transport. Upon loosening the stone, the piece separated quickly, falling and pinching left pinky finger between stone and flatbed surface. The EE had gloves, but retracted, causing a laceration.
Employee was operating Splitter #5. There was a piece of stone stuck in the machine and belt. Employee went to remove the stone piece, and EE's finger on EE's right hand was pinched, cut.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
1 linked controller.
Relationships reflect the selected mine status and current MSHA controller/operator fields.