Buchanan Mine #1 · 440485630 CFR 77.205(b) · Significant and substantial (S&S) · $883.00 proposed penalty
Cable fittings; suitability.
Buchanan Mine #1 · 440485630 CFR 77.505 · $177.00 proposed penalty
Cable fittings; suitability.
Buchanan Mine #1 · 440485630 CFR 77.505 · $177.00 proposed penalty
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(g) · $165.00 proposed penalty
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(g) · $165.00 proposed penalty
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(g) · $165.00 proposed penalty
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(g) · $165.00 proposed penalty
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(g) · $165.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $755.00 proposed penalty
Escapeways; bituminous and lignite mines.
Buchanan Mine #1 · 440485630 CFR 75.380(d)(7)(vii)(A) · $592.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(a) · $288.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 7.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.512 · $642.00 proposed penalty
Weekly examination.
Buchanan Mine #1 · 440485630 CFR 75.364(g) · $151.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Buchanan Mine #1 · 440485630 CFR 77.516 · $151.00 proposed penalty
Surface installations; general.
Buchanan Mine #1 · 440485630 CFR 77.200 · $177.00 proposed penalty
Cable fittings; suitability.
Buchanan Mine #1 · 440485630 CFR 75.515 · $267.00 proposed penalty
Machinery
Buchanan Mine #1 · 4404856Days restricted activity only
Accident narrative
The injured was drilling a hole in the roof at CC#32 on 5 North Mains, preparing to install a cable bolt. While drilling a piece of rock fall around drill steel. The injured inadvertently placed a hand on the bolt tray to attempt to move, when the rock fell striking them on the left hand that was on the bolt tray, causing a laceration which required 3 sutures to close.
Power wires and cables; insulation and protection.
Buchanan Mine #1 · 440485630 CFR 75.517 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Buchanan Mine #1 · 440485630 CFR 75.517 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Buchanan Mine #1 · 440485630 CFR 75.517 · $151.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 7.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.512 · $151.00 proposed penalty
Permanent splicing of trailing cables.
Buchanan Mine #1 · 440485630 CFR 75.604(b) · $151.00 proposed penalty
Atmospheric monitoring systems.
Buchanan Mine #1 · 440485630 CFR 75.351(n)(3)(i) · $1,037.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.