ACTIVE / OPERATOR PORTFOLIO

Bison Materials LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0106185

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Bison No 13402093 · Active6/8 quarters reportedWashington, OKSurface · MSHA: Crushed, Broken Limestone NEC051,64430162.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

30

5 significant & substantial (S&S)

  1. 2025 Q12
  2. 2025 Q25
  3. 2025 Q31
  4. 2025 Q44
  5. 2026 Q10
  6. 2026 Q218
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

13,901.00

30 of 30 violations with amounts

  1. 2025 Q1396
  2. 2025 Q22,895
  3. 2025 Q3151
  4. 2025 Q4604
  5. 2026 Q1—
  6. 2026 Q29,855
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

62.75

7 inspections · 7 with hours

  1. 2025 Q19.75
  2. 2025 Q28.75
  3. 2025 Q38.50
  4. 2025 Q415.00
  5. 2026 Q1—
  6. 2026 Q220.75
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q121396.000019.8
2025-Q2512,895.000038.8
2025-Q311151.001018.5
2025-Q440604.0000115.0
2026-Q100—000—
2026-Q21829,855.0000120.8
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF027F33
    Bison No 1 · 3402093

    Non-Fatal Accident Investigation · 8.5 on-site hours

  2. accident220251950013
    Bison No 1 · 3402093

    MACHINERY · DYS AWY FRM WRK & RESTRCTD ACT

    Accident narrative

    An EE was trying to remove a bit from drill pipe on John Henry drill. IE put a pipe wrench on the bit & spun the wrench so that it was touching the ground. IE stood on the pipe wrench to keep it from moving. EE began slowly rotating the drill pipe & pipe wrench sprung upward & threw IE sideways causing EE to land on EE's side on the ground.

  3. inspectionF019DC3
    Bison No 1 · 3402093

    Compliance Follow-up Inspection · 0.8 on-site hours

  4. violation5004637
    Bison No 1 · 3402093

    56.14130(g) · S&S · $1,037.00 proposed

  5. violation5004636
    Bison No 1 · 3402093

    56.14132(a) · $697.00 proposed

  6. violation5004635
    Bison No 1 · 3402093

    56.14107(a) · $313.00 proposed

  7. violation5004634
    Bison No 1 · 3402093

    56.12004 · $697.00 proposed

  8. inspectionF019DC1
    Bison No 1 · 3402093

    Regular Safety and Health Inspection · 8.0 on-site hours

  9. inspection6932889
    Bison No 1 · 3402093

    Spot Inspection · 0.0 on-site hours

  10. violation5004218
    Bison No 1 · 3402093

    50.20(a) · $151.00 proposed

  11. violation9798887
    Bison No 1 · 3402093

    56.4430(b)(3) · $151.00 proposed

  12. violation9798886
    Bison No 1 · 3402093

    56.15004 · S&S · $245.00 proposed

  13. inspectionF012311
    Bison No 1 · 3402093

    Regular Safety and Health Inspection · 9.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.