ALL STATUSES / OPERATOR PORTFOLIO

Big Horn Redi-Mix Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL16909

MINE PORTFOLIO

7 of 7 mines and facilities

2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CODY LUMBER PIT4800274 · IntermittentHot Springs, WYSurface · MSHA: Construction Sand and Gravel——505.0
Worland Wash Plant4800777 · IntermittentWashakie, WYSurface · MSHA: Construction Sand and Gravel——3011.5
Farmer Crusher4801711 · Temporarily IdledWashakie, WYSurface · MSHA: Construction Sand and Gravel——00—
FEELY PIT WASH PLANT4800266 · AbandonedPark, WYSurface · MSHA: Construction Sand and Gravel——00—
Greybull Wash Plant4801642 · AbandonedBig Horn, WYSurface · MSHA: Construction Sand and Gravel——000.5
MOLNAR PIT4801892 · Temporarily IdledBig Horn, WYSurface · MSHA: Construction Sand and Gravel——1010.5
Willy Pit4801722 · AbandonedPark, WYSurface · MSHA: Construction Sand and Gravel——00—

LOCATION

Portfolio map

6 of 7 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

9

3 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q22
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q15
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

1,373.00

9 of 9 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2316
  3. 2025 Q3151
  4. 2025 Q4—
  5. 2026 Q1755
  6. 2026 Q2—
  7. 2026 Q3151
  8. 2026 Q4 *—

On-site inspection hours

27.50

7 inspections · 7 with hours

  1. 2025 Q1—
  2. 2025 Q28.50
  3. 2025 Q39.50
  4. 2025 Q4—
  5. 2026 Q15.00
  6. 2026 Q2—
  7. 2026 Q34.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q221316.000028.5
2025-Q310151.000029.5
2025-Q400—000—
2026-Q152755.000015.0
2026-Q200—000—
2026-Q310151.000024.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF010EF8
    MOLNAR PIT · 4801892

    Regular Safety and Health Inspection · 1.5 on-site hours

  2. inspection6469099
    Worland Wash Plant · 4800777

    Regular Safety and Health Inspection · 3.0 on-site hours

  3. violation9732061
    Worland Wash Plant · 4800777

    56.12004 · $151.00 proposed

  4. violation5033740
    CODY LUMBER PIT · 4800274

    56.12032 · $151.00 proposed

  5. violation5033739
    CODY LUMBER PIT · 4800274

    56.12008 · S&S · $151.00 proposed

  6. violation5033738
    CODY LUMBER PIT · 4800274

    56.12030 · $151.00 proposed

  7. violation5033737
    CODY LUMBER PIT · 4800274

    56.12030 · $151.00 proposed

  8. violation5033736
    CODY LUMBER PIT · 4800274

    56.12023 · S&S · $151.00 proposed

  9. inspectionF010ED9
    CODY LUMBER PIT · 4800274

    Regular Safety and Health Inspection · 5.0 on-site hours

  10. inspection6469080
    Greybull Wash Plant · 4801642

    Mine Idle Activity · 0.5 on-site hours

  11. inspection6469077
    MOLNAR PIT · 4801892

    Regular Safety and Health Inspection · 9.0 on-site hours

  12. violation9732040
    MOLNAR PIT · 4801892

    56.14112(b) · $151.00 proposed

  13. inspection6469070
    Worland Wash Plant · 4800777

    Regular Safety and Health Inspection · 7.3 on-site hours

  14. inspection6469071
    Worland Wash Plant · 4800777

    Verbal Hazard Complaint Inspections · 1.3 on-site hours

  15. violation9732034
    Worland Wash Plant · 4800777

    56.15005 · S&S · $165.00 proposed

  16. violation9732033
    Worland Wash Plant · 4800777

    56.4104(b) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.