ALL STATUSES / OPERATOR PORTFOLIO

ARCOSA LWB, LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0134299

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Arcosa Boulder Plant #16040504415 · IntermittentJefferson, COSurface · MSHA: Common Shale——42283.5

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

42

7 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q221
  3. 2025 Q30
  4. 2025 Q417
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

83,636.00

42 of 42 violations with amounts

  1. 2025 Q122,079
  2. 2025 Q236,175
  3. 2025 Q3—
  4. 2025 Q425,382
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

83.50

4 inspections · 4 with hours

  1. 2025 Q15.00
  2. 2025 Q229.50
  3. 2025 Q31.25
  4. 2025 Q447.75
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q14322,079.002015.0
2025-Q221336,175.0000129.5
2025-Q300—0011.3
2025-Q417125,382.0000147.8
2026-Q100—000—
2026-Q200—000—
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5057218
    Arcosa Boulder Plant #1604 · 0504415

    46.9(c)(4) · $151.00 proposed

  2. violation5057217
    Arcosa Boulder Plant #1604 · 0504415

    56.14100(b) · $2,133.00 proposed

  3. violation6941297
    Arcosa Boulder Plant #1604 · 0504415

    56.14100(b) · $1,431.00 proposed

  4. violation5057216
    Arcosa Boulder Plant #1604 · 0504415

    56.13011 · $288.00 proposed

  5. violation5057215
    Arcosa Boulder Plant #1604 · 0504415

    56.4130(b) · $642.00 proposed

  6. violation5057214
    Arcosa Boulder Plant #1604 · 0504415

    56.13011 · $288.00 proposed

  7. inspectionF01DC6E
    Arcosa Boulder Plant #1604 · 0504415

    Regular Safety and Health Inspection · 47.8 on-site hours

  8. violation6941296
    Arcosa Boulder Plant #1604 · 0504415

    56.20003(a) · $1,968.00 proposed

  9. violation6941295
    Arcosa Boulder Plant #1604 · 0504415

    56.12025 · $642.00 proposed

  10. violation6941294
    Arcosa Boulder Plant #1604 · 0504415

    56.14107(a) · $642.00 proposed

  11. violation6941293
    Arcosa Boulder Plant #1604 · 0504415

    56.14107(a) · $642.00 proposed

  12. violation6941292
    Arcosa Boulder Plant #1604 · 0504415

    56.12030 · $1,431.00 proposed

  13. violation6941291
    Arcosa Boulder Plant #1604 · 0504415

    56.12030 · $1,431.00 proposed

  14. violation6941290
    Arcosa Boulder Plant #1604 · 0504415

    56.12030 · $1,431.00 proposed

  15. violation6941289
    Arcosa Boulder Plant #1604 · 0504415

    56.14112(a)(1) · $642.00 proposed

  16. violation6941288
    Arcosa Boulder Plant #1604 · 0504415

    56.14110 · $432.00 proposed

  17. violation5057213
    Arcosa Boulder Plant #1604 · 0504415

    56.11012 · $1,431.00 proposed

  18. violation5057212
    Arcosa Boulder Plant #1604 · 0504415

    56.20003(a) · S&S · $9,757.00 proposed

  19. inspectionF01CC23
    Arcosa Boulder Plant #1604 · 0504415

    Special Emphasis Programs · 1.3 on-site hours

  20. violation5051484
    Arcosa Boulder Plant #1604 · 0504415

    46.3(b)(4) · $151.00 proposed

  21. violation5051483
    Arcosa Boulder Plant #1604 · 0504415

    56.20003(a) · S&S · $151.00 proposed

  22. violation5051482
    Arcosa Boulder Plant #1604 · 0504415

    56.14100(c) · $432.00 proposed

  23. violation5051481
    Arcosa Boulder Plant #1604 · 0504415

    56.12018 · $1,431.00 proposed

  24. violation5051480
    Arcosa Boulder Plant #1604 · 0504415

    56.20003(a) · $1,968.00 proposed

  25. violation5051479
    Arcosa Boulder Plant #1604 · 0504415

    56.20003(a) · $1,968.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.