Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MSHA OPERATOR ID0186133
MINE PORTFOLIO
11 of 11 mines and facilities
2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
Maricopa, AZSurface · MSHA: Construction Sand and Gravel
—
—
0
0
—
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
Portfolio map
11 of 11 mines with usable MSHA coordinates. Select a marker to open a mine.
Database snapshot · 2026-10-17. All 11 mines listed under this operator were checked; 0 have reports in the available quarters. Totals use current ownership.
Coal production
—
reported short tons
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Hours worked
—
reported employee hours
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Tons per hour
—
production ÷ hours worked
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
Quarterly production, employment and reporting coverage for Arcosa Aggregates West, LLC.
Quarter
Coal (short tons)
Hours worked
Tons / hour
Avg. employees
Coverage
2025 Q1
—
—
—
—
No report
2025 Q2
—
—
—
—
No report
2025 Q3
—
—
—
—
No report
2025 Q4
—
—
—
—
No report
2026 Q1
—
—
—
—
No report
2026 Q2
—
—
—
—
No report
2026 Q3
—
—
—
—
No report
2026 Q4
—
—
—
—
No report
Safety and enforcement
2025-01-01 – 2026-10-17
Violations
74
19 significant & substantial (S&S)
2025 Q110
2025 Q214
2025 Q314
2025 Q48
2026 Q114
2026 Q26
2026 Q38
2026 Q4 *0
Accident records
7
0 records classified as fatality
2025 Q10
2025 Q22
2025 Q31
2025 Q42
2026 Q10
2026 Q22
2026 Q30
2026 Q4 *0
Proposed penalties · USD
24,589.00
67 of 74 violations with amounts
2025 Q16,531
2025 Q25,166
2025 Q33,490
2025 Q42,283
2026 Q14,256
2026 Q22,712
2026 Q3151
2026 Q4 *—
On-site inspection hours
227.50
31 inspections · 31 with hours
2025 Q114.00
2025 Q242.50
2025 Q351.50
2025 Q414.00
2026 Q153.75
2026 Q214.50
2026 Q337.25
2026 Q4 *—
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
Quarter
Violations
S&S
Proposed USD
Accident records
Fatality records
Inspections
On-site hours
2025-Q1
10
4
6,531.00
0
0
3
14.0
2025-Q2
14
2
5,166.00
2
0
4
42.5
2025-Q3
14
3
3,490.00
1
0
5
51.5
2025-Q4
8
5
2,283.00
2
0
4
14.0
2026-Q1
14
4
4,256.00
0
0
6
53.8
2026-Q2
6
1
2,712.00
2
0
2
14.5
2026-Q3
8
0
151.00
0
0
7
37.3
2026-Q4 *
0
0
—
0
0
0
—
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
The employee entered the feeder/jaw area with fall protection to remove a large boulder that could not be crushed. After accessing the area by lifting a safety gate, the employee began clearing smaller rocks. While sitting down taking a break to drink water, they accidentally contacted the gate, causing it to fall onto their left knee and resulted in a laceration.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
1 linked controller.
Relationships reflect the selected mine status and current MSHA controller/operator fields.