← Aracoma Coal Company LLC

Aracoma Coal Company LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5130506
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.503 · $642.00 proposed penalty

  2. Quantity and location of firefighting equipment.

    violationRecord 5130505
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1100-2(d) · $151.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5130504
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  4. Installation of high-voltage transmission cables.

    violationRecord 5130503
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.807 · $959.00 proposed penalty

  5. Inspection of fire suppression devices.

    violationRecord 5130060
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5130059
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5130058
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.400 · $288.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5130057
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.503 · $288.00 proposed penalty

  9. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5130056
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

  10. Methane monitors.

    violationRecord 5130055
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  11. Fall of roof or back

    accidentRecord 220253170133
    Cedar Grove Mine No 3 · 4609611

    Accident only

    Accident narrative

    Roof fall while pillaring on the 002 section in #8 Entry Crosscut 15 fell on the continuous miner, agencies were notified an action plan submitted, the continuous miner was recovered from the fall area

  12. Spot Inspections

    inspectionRecord 7048261
    Lynn Branch No. 2 Mine · 4609575

    103(i) · 8.0 on-site hours reported

  13. Non-Injury Accident Investigation

    inspectionRecord F020A4E
    Cedar Grove Mine No 3 · 4609611

    6.5 on-site hours reported

  14. Permanent splicing of trailing cables.

    violationRecord 9840000
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  15. Roof control plan.

    violationRecord 9839999
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 5130502
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1722(a) · $193.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5130501
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.512 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  18. Violation — cited standard not reported

    violationRecord 5099230
    Cedar Grove Mine No 3 · 4609611
  19. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5130054
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.1600-2(b) · $165.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5099232
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9838389
    Davy Branch Mine · 4609574

    30 CFR 75.202(a) · $1,219.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 5130500
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  23. Installation of high-voltage transmission cables.

    violationRecord 5091999
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.807 · $959.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 5091998
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  25. Violation — cited standard not reported

    violationRecord 5091997
    Lynn Branch No. 2 Mine · 4609575

    $658.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.