← Aracoma Coal Company LLC

Aracoma Coal Company LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5132479
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 5132473
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · $226.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5132472
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  4. Condition and examination of firefighting equipment.

    violationRecord 5132471
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.1100-3 · $151.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5132470
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F017F4F
    Lynn Branch No. 2 Mine · 4609575

    103(i) · 4.5 on-site hours reported

  7. Preshift examination at fixed intervals.

    violationRecord 5091186
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.360(f) · $151.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5091185
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 5132469
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.604(b) · $226.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5132468
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  11. Roof control plan.

    violationRecord 5132467
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  12. Conventional roof support.

    violationRecord 5132466
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.206(e) · $504.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5132465
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.202(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5095513
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5095512
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.400 · $151.00 proposed penalty

  16. Preshift examination at fixed intervals.

    violationRecord 5132133
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.360(f) · $151.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5132132
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.512 · $245.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5132131
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.503 · $245.00 proposed penalty

  19. Permissible electric face equipment; maintenance.

    violationRecord 5132464
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.503 · $151.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 5132463
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Other safeguards.

    violationRecord 5132130
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1403

  22. Machinery and equipment; operation and maintenance.

    violationRecord 5132129
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5132457
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  24. On-shift examination.

    violationRecord 5132456
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  25. Short circuit protection of trailing cables.

    violationRecord 5132455
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.601 · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.