Aracoma Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Clamping of trailing cables to equipment.
Davy Branch Mine · 460957430 CFR 75.605 · $151.00 proposed penalty
Permanent splicing of trailing cables.
Davy Branch Mine · 460957430 CFR 75.604(b) · $465.00 proposed penalty
Machinery and equipment; operation and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Identification of circuit breakers.
Lynn Branch No. 2 Mine · 460957530 CFR 75.904 · $432.00 proposed penalty
Roof control plan.
Cedar Grove Mine No 3 · 460961130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Accumulation of combustible materials.
Cedar Grove Mine No 3 · 460961130 CFR 75.400 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Cedar Grove Mine No 3 · 460961130 CFR 75.503 · $151.00 proposed penalty
Spot Inspections
Lynn Branch No. 2 Mine · 4609575103(i) · 4.5 on-site hours reported
Accumulation of combustible materials.
Davy Branch Mine · 460957430 CFR 75.400 · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
Davy Branch Mine · 460957430 CFR 75.370(a)(1) · $209.00 proposed penalty
Roof control plan.
Davy Branch Mine · 460957430 CFR 75.220(a)(1) · $209.00 proposed penalty
Installation of water sprinkler systems; requirements.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1101-7(b) · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.512 · $226.00 proposed penalty
Accumulation of combustible materials.
Cedar Grove Mine No 3 · 460961130 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Cedar Grove Mine No 3 · 460961130 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Cedar Grove Mine No 3 · 460961130 CFR 75.370(a)(1) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.503 · $549.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $549.00 proposed penalty
Roof control plan.
Lynn Branch No. 2 Mine · 460957530 CFR 75.220(a)(1) · $193.00 proposed penalty
Proximity detection systems.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Roof control plan.
Lynn Branch No. 2 Mine · 460957530 CFR 75.220(a)(1) · $432.00 proposed penalty
Power wires and cables; insulation and protection.
Cedar Grove Mine No 3 · 460961130 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Power wires and cables; insulation and protection.
Cedar Grove Mine No 3 · 460961130 CFR 75.517 · $193.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Cedar Grove Mine No 3 · 460961130 CFR 77.502 · $151.00 proposed penalty
Travelways at surface installations.
Cedar Grove Mine No 3 · 460961130 CFR 77.205(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.