  1. Map of electrical system.

    violationRecord 5036309
    GENTRY MINE #3 · 4202263

    30 CFR 75.508 · $151.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 5035937
    GENTRY MINE #3 · 4202263

    30 CFR 75.517 · Significant and substantial (S&S) · $755.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5035936
    GENTRY MINE #3 · 4202263

    30 CFR 75.503 · $168.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5035935
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $313.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5035934
    GENTRY MINE #3 · 4202263

    30 CFR 75.1909(d) · $151.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5035933
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $313.00 proposed penalty

  7. Mechanical equipment guards.

    violationRecord 5035932
    GENTRY MINE #3 · 4202263

    30 CFR 75.1722(a) · $151.00 proposed penalty

  8. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5035931
    GENTRY MINE #3 · 4202263

    30 CFR 75.1909(b)(5) · $151.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5035930
    GENTRY MINE #3 · 4202263

    30 CFR 75.1731(a) · $151.00 proposed penalty

  10. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5035929
    GENTRY MINE #3 · 4202263

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  11. Methane monitors.

    violationRecord 5035928
    GENTRY MINE #3 · 4202263

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5035927
    GENTRY MINE #3 · 4202263

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  13. Proximity detection systems.

    violationRecord 5035926
    GENTRY MINE #3 · 4202263

    30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5035925
    GENTRY MINE #3 · 4202263

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  15. Ventilation controls.

    violationRecord 5035924
    GENTRY MINE #3 · 4202263

    30 CFR 75.333(h) · $245.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 5035923
    GENTRY MINE #3 · 4202263

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5035922
    GENTRY MINE #3 · 4202263

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  18. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5035921
    GENTRY MINE #3 · 4202263

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  19. On-shift examination.

    violationRecord 5035920
    GENTRY MINE #3 · 4202263

    30 CFR 75.362(a)(1) · $504.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5035919
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $313.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5035918
    GENTRY MINE #3 · 4202263

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  22. Identification check system.

    violationRecord 5035917
    GENTRY MINE #3 · 4202263

    30 CFR 75.1715 · $151.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5035916
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $313.00 proposed penalty

  24. Preshift examination at fixed intervals.

    violationRecord 5035915
    GENTRY MINE #3 · 4202263

    30 CFR 75.360(f) · $151.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 5035914
    GENTRY MINE #3 · 4202263

    30 CFR 75.517 · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.