Winchester 2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Mechanical equipment guards.

    violationRecord 5184071

    30 CFR 77.400(c)

  2. Accumulation of combustible materials.

    violationRecord 5184070

    30 CFR 75.400

  3. Permanent splicing of trailing cables.

    violationRecord 5184060

    30 CFR 75.604(b)

  4. Accumulation of combustible materials.

    violationRecord 5184059

    30 CFR 75.400

  5. Automatic emergency-parking brakes.

    violationRecord 5184058

    30 CFR 75.523-3(b)(5)

  6. Accumulation of combustible materials.

    violationRecord 5184057

    30 CFR 75.400

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5184056

    30 CFR 75.1725(a)

  8. Roof control plan.

    violationRecord 5184055

    30 CFR 75.220(a)(1)

  9. Mine ventilation plan; submission and approval.

    violationRecord 5184054

    30 CFR 75.370(a)(1)

  10. Regular Safety and Health Inspection

    inspectionRecord F0058C0

    38.3 on-site hours reported

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 5021263

    30 CFR 75.512

  12. Mine ventilation plan; submission and approval.

    violationRecord 5028730

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5028729

    30 CFR 75.202(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5021260

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  15. Preshift examination at fixed intervals.

    violationRecord 5021259

    30 CFR 75.360(f) · $177.00 proposed penalty

  16. Roof control plan.

    violationRecord 5028728

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5028722

    30 CFR 75.1731(b) · $151.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5028721

    30 CFR 75.202(a) · Significant and substantial (S&S) · $313.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5028720

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord 6321645

    228.3 on-site hours reported

  21. Records of certified and qualified persons.

    violationRecord 5028709

    30 CFR 75.159 · $151.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5028708

    30 CFR 75.202(a) · Significant and substantial (S&S) · $313.00 proposed penalty

  23. Verbal Hazard Complaint Inspections

    inspectionRecord F022D77

    2.5 on-site hours reported

  24. Ventilation controls.

    violationRecord 5028707

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  25. Communications facilities; refuge alternatives.

    violationRecord 5028705

    30 CFR 75.1600-3(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.