Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Short circuit protection of trailing cables.

    violationRecord 5023548

    30 CFR 75.601 · $151.00 proposed penalty

  2. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5023547

    30 CFR 75.601-1 · $151.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 9848968

    30 CFR 75.503 · $1,126.00 proposed penalty

  4. Automatic emergency-parking brakes.

    violationRecord 9848967

    30 CFR 75.523-3(c)(2) · $245.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 9848966

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  6. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 9848965

    30 CFR 75.1107-7(b) · $245.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9848964

    30 CFR 75.400 · $432.00 proposed penalty

  8. Methane monitors.

    violationRecord 9848963

    30 CFR 75.342(a)(4) · $1,320.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 9849090

    30 CFR 75.604(b) · $398.00 proposed penalty

  10. Roof control plan.

    violationRecord 9848962

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F00FEEC

    103(i) · 6.0 on-site hours reported

  12. Mine ventilation plan; submission and approval.

    violationRecord 9840116

    30 CFR 75.370(a)(1) · $177.00 proposed penalty

  13. Ventilation controls.

    violationRecord 9840115

    30 CFR 75.333(c) · $165.00 proposed penalty

  14. Permanent splicing of trailing cables.

    violationRecord 9849089

    30 CFR 75.604(b) · $883.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 9849088

    30 CFR 75.503 · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9849087

    30 CFR 75.400 · $209.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9849086

    30 CFR 75.400 · $193.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 9849085

    30 CFR 75.512 · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9849084

    30 CFR 75.400 · $193.00 proposed penalty

  20. Inspection of dry powder chemical systems.

    violationRecord 9849083

    30 CFR 75.1101-22(a) · $151.00 proposed penalty

  21. Handtools (nonpowered)

    accidentRecord 220250360019

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was injured when EE struck self in the face with a ratchet while tightening the gear case mounting bolts on a continuous miner causing a laceration above EE's left eye resulting in 18 sutures.

  22. Spot Inspections

    inspectionRecord F00FEEB

    103(i) · 5.0 on-site hours reported

  23. Protection from falls of roof, face and ribs.

    violationRecord 9849082

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 9848608

    30 CFR 75.604(b) · $398.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 9848607

    30 CFR 75.503 · $1,679.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.