← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible exposure level.

    violationRecord 9849108

    30 CFR 62.130(b) · $366.00 proposed penalty

  2. Permissible exposure level.

    violationRecord 9849107

    30 CFR 62.130(b) · $366.00 proposed penalty

  3. Roof control plan.

    violationRecord 9849106

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 9849105

    30 CFR 75.202(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  5. Methane monitors.

    violationRecord 9849104

    30 CFR 75.342(a)(4) · $209.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 9849103

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9849102

    30 CFR 75.400 · $209.00 proposed penalty

  8. Drill dust control at underground areas of underground mines.

    violationRecord 9849101

    30 CFR 72.630(b) · $165.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 9849100

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9849099

    30 CFR 75.400 · $193.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 9849098

    30 CFR 75.503 · $151.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 9849097

    30 CFR 75.503 · $151.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 9849096

    30 CFR 75.503 · $151.00 proposed penalty

  14. Inspection of fire suppression devices.

    violationRecord 9849095

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 9849094

    30 CFR 75.512 · $151.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 9849093

    30 CFR 75.904 · $366.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9849092

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  18. Permanent splicing of trailing cables.

    violationRecord 9848973

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 9848972

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 9848971

    30 CFR 75.503 · $1,219.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F00FEED

    103(i) · 6.5 on-site hours reported

  22. Cable fittings; suitability.

    violationRecord 9849091

    30 CFR 75.515 · $366.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 9848970

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 9848969

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  25. Clamping of trailing cables to equipment.

    violationRecord 5023549

    30 CFR 75.605 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.