← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 9848516

    30 CFR 75.1403 · Significant and substantial (S&S) · $38,016.00 proposed penalty

  2. Machinery and equipment; operation and maintenance.

    violationRecord 9847392

    30 CFR 75.1725(a) · $313.00 proposed penalty

  3. Spot Inspections

    inspectionRecord 6322978

    103(i) · 5.0 on-site hours reported

  4. Machinery and equipment; operation and maintenance.

    violationRecord 9847391

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 9847390

    30 CFR 75.400 · $432.00 proposed penalty

  6. Spot Inspections

    inspectionRecord 6319293

    103(i) · 6.0 on-site hours reported

  7. Cable fittings; suitability.

    violationRecord 9848515

    30 CFR 75.515 · $818.00 proposed penalty

  8. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9847389

    30 CFR 75.701 · $245.00 proposed penalty

  9. Spot Inspections

    inspectionRecord 6322976

    103(i) · 5.5 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord 6322544

    438.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord F00E9F1

    103(i) · 5.0 on-site hours reported

  12. Slip or fall of person

    accidentRecord 220250930001

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was injured while in the process of closing airlock doors. Employee was walking over track when EE tripped on the track and attempted to catch self with EE's hands causing a laceration to the left hand, resulting in 5 sutures.

  13. Permanent splicing of trailing cables.

    violationRecord 9849115

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 9849114

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  15. Violation — cited standard not reported

    violationRecord 9849113

    $151.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F00FEF2

    103(i) · 5.0 on-site hours reported

  17. Spot Inspections

    inspectionRecord F00FEF1

    103(i) · 5.0 on-site hours reported

  18. Status change reports.

    violationRecord 9849112

    30 CFR 70.212(a) · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F00FEF0

    103(i) · 4.0 on-site hours reported

  20. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9849111

    30 CFR 75.1731(b) · Significant and substantial (S&S) · $592.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9849110

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F00FEEF

    103(i) · 5.0 on-site hours reported

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5023550

    30 CFR 75.1731(a) · $151.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F00FEEE

    103(i) · 6.0 on-site hours reported

  25. Permissible exposure level.

    violationRecord 9849109

    30 CFR 62.130(b) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.