← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 5025308

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  2. Spot Inspections

    inspectionRecord 6322997

    103(i) · 4.0 on-site hours reported

  3. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5026252

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5026251

    30 CFR 75.503 · $245.00 proposed penalty

  5. Machinery and equipment; operation and maintenance.

    violationRecord 5026250

    30 CFR 75.1725(a) · $1,550.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F006728

    103(i) · 6.5 on-site hours reported

  7. Escapeways; bituminous and lignite mines.

    violationRecord 9847403

    30 CFR 75.380(d)(4) · $151.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 9847402

    30 CFR 75.1725(a) · $1,550.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 9847401

    30 CFR 75.604(b) · $313.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5026249

    30 CFR 75.380(d)(4) · $193.00 proposed penalty

  11. Fire suppression devices.

    violationRecord 5025301

    30 CFR 75.1107 · $193.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F006727

    103(i) · 15.0 on-site hours reported

  13. Other safeguards.

    violationRecord 5026248

    30 CFR 75.1403 · $313.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5026247

    30 CFR 75.400 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  15. Mining methods.

    violationRecord 5026246

    30 CFR 75.203(e)(2) · $193.00 proposed penalty

  16. Air quality detectors and measurement devices.

    violationRecord 5026245

    30 CFR 75.320(a) · $151.00 proposed penalty

  17. Methane monitors.

    violationRecord 5026244

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  18. Methane monitors.

    violationRecord 5026243

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord 6321490

    437.5 on-site hours reported

  20. Spot Inspections

    inspectionRecord 6321489

    103(i) · 6.0 on-site hours reported

  21. Spot Inspections

    inspectionRecord 6321488

    103(i) · 7.0 on-site hours reported

  22. Methane monitors.

    violationRecord 5026242

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5026241

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F00FEF6

    103(i) · 4.0 on-site hours reported

  25. Spot Inspections

    inspectionRecord F005849

    103(i) · 7.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.