← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permanent splicing of trailing cables.

    violationRecord 5025015

    30 CFR 75.604(b) · $5,144.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5025014

    30 CFR 75.400 · $432.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5025013

    30 CFR 75.1725(a) · $1,320.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5025012

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  5. Permissible electric face equipment; maintenance.

    violationRecord 5023574

    30 CFR 75.503 · $336.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F006732

    103(i) · 7.0 on-site hours reported

  7. Methane monitors.

    violationRecord 5026284

    30 CFR 75.342(a)(4) · $959.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5026283

    30 CFR 75.370(a)(1) · $1,219.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5026282

    30 CFR 75.512 · $2,312.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5025011

    30 CFR 75.517 · $883.00 proposed penalty

  11. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5025010

    30 CFR 75.1107-9(a)(1) · $177.00 proposed penalty

  12. Ventilation controls.

    violationRecord 9840140

    30 CFR 75.333(h) · $313.00 proposed penalty

  13. Weekly examination.

    violationRecord 9840139

    30 CFR 75.364(b)(4) · $177.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5025009

    30 CFR 75.333(d)(3) · $177.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F00E9FE

    103(i) · 5.0 on-site hours reported

  16. Methane monitors.

    violationRecord 5023573

    30 CFR 75.342(a)(4) · $336.00 proposed penalty

  17. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5023572

    30 CFR 75.601-1 · $245.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5025008

    30 CFR 75.503 · $398.00 proposed penalty

  19. Roof control plan.

    violationRecord 5025007

    30 CFR 75.220(a)(1) · $1,968.00 proposed penalty

  20. Communications facilities; refuge alternatives.

    violationRecord 5025006

    30 CFR 75.1600-3(a) · $209.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 5025005

    30 CFR 75.360(f) · $151.00 proposed penalty

  22. Rock dusting.

    violationRecord 5025004

    30 CFR 75.402 · $209.00 proposed penalty

  23. Roof testing and scaling.

    violationRecord 5025003

    30 CFR 75.211(d) · $209.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 5025002

    30 CFR 75.503 · $398.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord 6321626

    354.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.