← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Quarterly sampling; designated areas.

    violationRecord 5025187

    30 CFR 70.209(a) · $313.00 proposed penalty

  2. Quarterly sampling; mechanized mining units.

    violationRecord 5025186

    30 CFR 70.208(a)(2) · $366.00 proposed penalty

  3. Quarterly sampling; mechanized mining units.

    violationRecord 5025185

    30 CFR 70.208(a)(2) · $366.00 proposed penalty

  4. Quarterly sampling; mechanized mining units.

    violationRecord 5025184

    30 CFR 70.208(a)(2) · $366.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord 6321629

    436.8 on-site hours reported

  6. Spot Inspections

    inspectionRecord F00C76D

    103(i) · 4.0 on-site hours reported

  7. Spot Inspections

    inspectionRecord F00C76B

    103(i) · 5.0 on-site hours reported

  8. Spot Inspections

    inspectionRecord 6321500

    103(i) · 7.0 on-site hours reported

  9. Methane monitors.

    violationRecord 5021208

    30 CFR 75.342(a)(4) · $755.00 proposed penalty

  10. Ventilation controls.

    violationRecord 5028683

    30 CFR 75.333(c)(3) · $209.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 5025881

    30 CFR 75.503 · $1,320.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5025880

    30 CFR 75.503 · $1,320.00 proposed penalty

  13. Power wires and cables; insulation and protection.

    violationRecord 5025879

    30 CFR 75.517 · Significant and substantial (S&S) · $12,403.00 proposed penalty

  14. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5025878

    30 CFR 75.1107-4(a)(2)(i) · $697.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 5025877

    30 CFR 75.503 · $1,320.00 proposed penalty

  16. Spot Inspections

    inspectionRecord 6321499

    103(i) · 7.0 on-site hours reported

  17. Spot Inspections

    inspectionRecord 6321498

    103(i) · 7.0 on-site hours reported

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5028239

    30 CFR 75.512 · $4,383.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5028238

    30 CFR 75.202(a) · $4,383.00 proposed penalty

  20. Daily examination of hoisting equipment.

    violationRecord 5028237

    30 CFR 75.1400-3(b)(3) · $1,550.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F006733

    103(i) · 8.0 on-site hours reported

  22. Machinery and equipment; operation and maintenance.

    violationRecord 5026302

    30 CFR 75.1725(a) · $1,037.00 proposed penalty

  23. Permanent splicing of trailing cables.

    violationRecord 5026301

    30 CFR 75.604(b) · $1,320.00 proposed penalty

  24. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5026300

    30 CFR 75.1106-3(a)(2) · $642.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5026299

    30 CFR 75.380(d)(4) · $697.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.