← SKYLINE MINE #3

SKYLINE MINE #3 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Escape and evacuation; plan.

    violationRecord 5037026

    30 CFR 77.1101(c) · $288.00 proposed penalty

  2. Maintenance of incombustible content of rock dust.

    violationRecord 5037025

    30 CFR 75.403 · $226.00 proposed penalty

  3. Maintenance of incombustible content of rock dust.

    violationRecord 5037024

    30 CFR 75.403 · $226.00 proposed penalty

  4. Maintenance of incombustible content of rock dust.

    violationRecord 5037023

    30 CFR 75.403 · $226.00 proposed penalty

  5. Quarterly sampling; designated work positions.

    violationRecord 5037022

    30 CFR 71.206(a) · $226.00 proposed penalty

  6. Installation of water sprinkler systems; requirements.

    violationRecord 5037021

    30 CFR 75.1101-7(c) · $226.00 proposed penalty

  7. Roof control plan.

    violationRecord 5037020

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  8. Ventilation controls.

    violationRecord 5037019

    30 CFR 75.333(h) · $465.00 proposed penalty

  9. Preshift examination at fixed intervals.

    violationRecord 5037018

    30 CFR 75.360(d) · $226.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F00E3E3

    190.5 on-site hours reported

  11. Condition and examination of firefighting equipment.

    violationRecord 9734383

    30 CFR 75.1100-3 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  12. Belt air course ventilation.

    violationRecord 9734382

    30 CFR 75.350(a)(2) · $226.00 proposed penalty

  13. Machinery and equipment; operation and maintenance.

    violationRecord 5035608

    30 CFR 75.1725(a)

  14. Permissible electric face equipment; maintenance.

    violationRecord 5035607

    30 CFR 75.503 · $313.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 5035606

    30 CFR 75.512

  16. Compliance Follow-up Inspection

    inspectionRecord F010BB4

    38.5 on-site hours reported

  17. Other safeguards.

    violationRecord 5035605

    30 CFR 75.1403 · $226.00 proposed penalty

  18. Roof Control Technical Investigation

    inspectionRecord F00B8D8

    5.0 on-site hours reported

  19. Special Emphasis Programs

    inspectionRecord F010BB3

    4.0 on-site hours reported

  20. Examination and maintenance of firefighting equipment.

    violationRecord 5039073

    30 CFR 77.1110 · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F03ADA2

    64.0 on-site hours reported

  22. Handtools (nonpowered)

    accidentRecord 220260680019

    No dys awy frm wrk,no rstr act

    Accident narrative

    While using a track jack, the jack bar slipped out of the employee's hand and struck them in the chin causing a laceration.

  23. Temporary, portable containers.

    violationRecord 5037167

    30 CFR 47.44(b) · $151.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F00E3DF

    4.0 on-site hours reported

  25. Identification of circuit breakers and disconnecting switches.

    violationRecord 5037166

    30 CFR 77.809 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.