← SKYLINE MINE #3

SKYLINE MINE #3 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Travelways at surface installations.

    violationRecord 5030261

    30 CFR 77.205(a) · $226.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5030259

    30 CFR 75.202(a) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5030258

    30 CFR 75.400 · $592.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5030257

    30 CFR 75.503 · $336.00 proposed penalty

  5. Slip or fall of person

    accidentRecord 220250700021

    Days away from work only

    Accident narrative

    Surface Miner was walking to the forklift. EE stepped over something buried in the snow. When EE did, EE stepped on a belt bottom roller buried in the snow. EE fell back and to the side landing on a roller. This caused broken ribs on the left side.

  6. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5030256

    30 CFR 75.1731(a) · $465.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9734511

    30 CFR 75.400 · $592.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9734510

    30 CFR 75.400 · $267.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5030255

    30 CFR 75.400 · $592.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9734362

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  11. Maintenance of diesel-powered equipment.

    violationRecord 5030254

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  12. Ventilation controls.

    violationRecord 5030253

    30 CFR 75.333(h) · $504.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5030252

    30 CFR 75.400 · $592.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 5030251

    30 CFR 77.205(a) · $288.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5030250

    30 CFR 75.400 · $592.00 proposed penalty

  16. Maintenance of incombustible content of rock dust.

    violationRecord 5030249

    30 CFR 75.403 · $336.00 proposed penalty

  17. Handling of materials

    accidentRecord 220250510003

    No dys awy frm wrk,no rstr act

    Accident narrative

    While troubleshooting fan shroud on equipment, Employees thumb was struck by fan.

  18. Accumulation of combustible materials.

    violationRecord 5030248

    30 CFR 75.400 · $504.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 9734507

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  20. Ventilation controls.

    violationRecord 9734506

    30 CFR 75.333(h) · $504.00 proposed penalty

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 9734505

    30 CFR 75.512 · $313.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5030300

    30 CFR 75.400 · $592.00 proposed penalty

  23. Machinery and equipment; operation and maintenance.

    violationRecord 5030299

    30 CFR 75.1725(a) · $313.00 proposed penalty

  24. Handling of materials

    accidentRecord 220250420027

    No dys awy frm wrk,no rstr act

    Accident narrative

    Once underground employee got out of mantrip to check equipment. When getting back in EE shut their thumb in the door.

  25. Accumulation of combustible materials.

    violationRecord 5030247

    30 CFR 75.400 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.