← Shoal Creek Mine

Shoal Creek Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5060704

    30 CFR 75.1107-9(a)(1) · $366.00 proposed penalty

  2. Permanent splicing of trailing cables.

    violationRecord 5060703

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Ventilation controls.

    violationRecord 9825890

    30 CFR 75.333(h) · $432.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 9825889

    30 CFR 75.202(a) · $755.00 proposed penalty

  5. Ventilation controls.

    violationRecord 5060702

    30 CFR 75.333(h) · $366.00 proposed penalty

  6. Power wires; support.

    violationRecord 5060701

    30 CFR 75.516 · $151.00 proposed penalty

  7. Roof Control Technical Investigation

    inspectionRecord 6920855

    41.3 on-site hours reported

  8. Spot Inspections

    inspectionRecord 6972368

    103(i) · 7.0 on-site hours reported

  9. Machinery and equipment; operation and maintenance.

    violationRecord 5060700

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5060699

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  11. Roof control plan.

    violationRecord 5060698

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord 6972367

    491.5 on-site hours reported

  13. Ventilation Technical Investigation

    inspectionRecord 6917457

    38.0 on-site hours reported

  14. Dispensing of diesel fuel.

    violationRecord 9757502

    30 CFR 75.1905(b)(2) · $313.00 proposed penalty

  15. Dispensing of diesel fuel.

    violationRecord 9757501

    30 CFR 75.1905(b)(2) · $313.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F025C09

    103(i) · 3.0 on-site hours reported

  17. Verbal Hazard Complaint Inspections

    inspectionRecord 6916079

    8.0 on-site hours reported

  18. Testing, examination and maintenance.

    violationRecord 9821726

    30 CFR 75.821(a) · Significant and substantial (S&S) · $10,005.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 9821725

    30 CFR 75.517-1 · Significant and substantial (S&S) · $9,004.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6974192

    103(i) · 9.0 on-site hours reported

  21. Power wires and cables; insulation and protection.

    violationRecord 9827106

    30 CFR 75.517 · Significant and substantial (S&S) · $6,540.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 9827105

    30 CFR 72.630(b) · $592.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5061409

    30 CFR 75.400 · $818.00 proposed penalty

  24. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5061408

    30 CFR 75.1910(f) · $366.00 proposed penalty

  25. Verbal Hazard Complaint Inspections

    inspectionRecord 6974481

    5.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.