Shoal Creek Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 4.0 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $697.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Dispensing of diesel fuel.
30 CFR 75.1905(b)(1) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $2,312.00 proposed penalty
Permissible exposure level.
30 CFR 62.130(a) · $465.00 proposed penalty
Permissible exposure level.
30 CFR 62.130(a) · $465.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $398.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $592.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $592.00 proposed penalty
Investigation.
30 CFR 50.11(b) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $5,144.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $592.00 proposed penalty
Power wires; support.
30 CFR 75.516 · $313.00 proposed penalty
Power wires; support.
30 CFR 75.516 · $151.00 proposed penalty
Communication wires and cables; installation; insulation; support.
30 CFR 75.516-2(a) · $313.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(a)(3) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.