  1. Regular Safety and Health Inspection

    inspectionRecord F011734

    1.5 on-site hours reported

  2. Sealing of mines.

    violationRecord 5131750

    30 CFR 75.1711 · $151.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F03DF6E

    11.3 on-site hours reported

  4. Accumulations of combustible materials.

    violationRecord 5131749

    30 CFR 77.1104 · $151.00 proposed penalty

  5. Weekly examination.

    violationRecord 5132437

    30 CFR 75.364(a)(2) · Significant and substantial (S&S) · $4,497.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5132436

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5132434

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5094731

    30 CFR 75.202(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  9. Roof control plan.

    violationRecord 5094730

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $165.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5094729

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  11. Short circuit protection of trailing cables.

    violationRecord 5094728

    30 CFR 75.601 · $151.00 proposed penalty

  12. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5094727

    30 CFR 75.1101-10 · $151.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 5131393

    30 CFR 75.604(b) · Significant and substantial (S&S) · $366.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5131392

    30 CFR 75.202(a) · $151.00 proposed penalty

  15. Permanent splicing of trailing cables.

    violationRecord 5131391

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  16. Permanent splicing of trailing cables.

    violationRecord 5131390

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  17. Escapeway maps.

    violationRecord 5131389

    30 CFR 75.1505(a) · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F02EE00

    66.8 on-site hours reported

  19. Spot Inspection

    inspectionRecord F020A55

    7.0 on-site hours reported

  20. Roof control plan.

    violationRecord 5099293

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  21. Electrical Technical Investigation

    inspectionRecord F00EB36

    5.0 on-site hours reported

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5098450

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  23. Loading and haulage equipment; installations.

    violationRecord 5098449

    30 CFR 77.1605(d) · $151.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5098448

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  25. Inspection of fire suppression devices.

    violationRecord 5098447

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.