Sewell Mine R safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
1.5 on-site hours reported
Sealing of mines.
30 CFR 75.1711 · $151.00 proposed penalty
Regular Safety and Health Inspection
11.3 on-site hours reported
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Weekly examination.
30 CFR 75.364(a)(2) · Significant and substantial (S&S) · $4,497.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $165.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $165.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty
Short circuit protection of trailing cables.
30 CFR 75.601 · $151.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
66.8 on-site hours reported
Spot Inspection
7.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Electrical Technical Investigation
5.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · Significant and substantial (S&S) · $592.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.