ROAD FORK #52 MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $209.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $288.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $465.00 proposed penalty
Spot Inspections
103(i) · 7.3 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $151.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
Employee got out of their shuttle car to assist the electrician working on a roof bolter that was blocking the roadway. As they were cutting the conduit from a panic switch tree, the knife slipped cutting their left forearm.
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $288.00 proposed penalty
Spot Inspections
103(i) · 2.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.