← RIVER VIEW MINE

RIVER VIEW MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection of fire suppression devices.

    violationRecord 5044315

    30 CFR 75.1107-16-b · $151.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 5044628

    30 CFR 75.517 · Significant and substantial (S&S) · $642.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5048091

    30 CFR 75.1725(c) · Significant and substantial (S&S) · $10,569.00 proposed penalty

  4. Immediate notification.

    violationRecord 5044314

    30 CFR 50.10(d) · $151.00 proposed penalty

  5. Non-Injury Accident Investigation

    inspectionRecord 7040705

    18.0 on-site hours reported

  6. Violation — cited standard not reported

    violationRecord 5044311
  7. Roof control plan.

    violationRecord 5044313

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  8. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5044312

    30 CFR 75.363(b) · $177.00 proposed penalty

  9. Fall of roof or back

    accidentRecord 220262430071

    Accident only

    Accident narrative

    A roof fall has occurred on the #1 unit of the 1I panel in #4 entry. From spad 20+20 to 20+85. The fall measured 25ft x 6ft x 19ft. The fall will not be loaded out and the area has had additional support added.

  10. Methane monitors.

    violationRecord 5044310

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord 7040704

    103(i) · 7.8 on-site hours reported

  12. Power wires and cables; insulation and protection.

    violationRecord 5044309

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5048090

    30 CFR 75.202(a) · $151.00 proposed penalty

  14. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5044308

    30 CFR 75.1910(j) · $336.00 proposed penalty

  15. Escapeway maps.

    violationRecord 5048089

    30 CFR 75.1505(b) · $151.00 proposed penalty

  16. Permissible electric face equipment; maintenance.

    violationRecord 5044627

    30 CFR 75.503 · $151.00 proposed penalty

  17. Permissible electric face equipment; maintenance.

    violationRecord 5044307

    30 CFR 75.503 · $151.00 proposed penalty

  18. Preshift examination at fixed intervals.

    violationRecord 5044773

    30 CFR 75.360(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  19. Roof control plan.

    violationRecord 5044772

    30 CFR 75.220(a)(1) · $209.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5044771

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 5044770

    30 CFR 75.360(f) · $209.00 proposed penalty

  22. Ventilation controls.

    violationRecord 5044769

    30 CFR 75.333(h) · $151.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5044626

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5044625

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  25. Handling of materials

    accidentRecord 220262660028

    Days away from work only

    Accident narrative

    Employee was pulling a 3/4" waterline over a feeder. The hose got hung up on the backside and as they pulled on the hose, they felt a burning pain in their left shoulder and bicep. Employee worked until 09/23/2026 to have surgery to repair a torn rotator cuff and bicep.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.