← RIVER VIEW MINE

RIVER VIEW MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways; bituminous and lignite mines.

    violationRecord 9769281

    30 CFR 75.380(d)(7)(i) · $151.00 proposed penalty

  2. Disconnecting devices.

    violationRecord 9769390

    30 CFR 75.903 · $245.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9769330

    30 CFR 75.1731(a) · $151.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9769280

    30 CFR 75.1731(a) · $313.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9769279

    30 CFR 75.1731(b) · $151.00 proposed penalty

  6. Criteria—Haulage; general.

    violationRecord 9769278

    30 CFR 75.1403-10(a) · $151.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9769052

    30 CFR 75.1731(a) · $151.00 proposed penalty

  8. Belt air course ventilation.

    violationRecord 9769051

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  9. Roof bolting.

    violationRecord 9760402

    30 CFR 75.204(c)(1) · $245.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9760401

    30 CFR 75.400 · $398.00 proposed penalty

  11. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9769389

    30 CFR 75.1600-2(e) · $245.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9769277

    30 CFR 75.400 · $177.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F00F7FD

    103(i) · 7.0 on-site hours reported

  14. Methane monitors.

    violationRecord 9769329

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 9769328

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  16. Roof control plan.

    violationRecord 9769276

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  17. Refuge alternatives.

    violationRecord 9769146

    30 CFR 75.1506(g) · $151.00 proposed penalty

  18. Proximity detection systems.

    violationRecord 9769327

    30 CFR 75.1732(b) · $151.00 proposed penalty

  19. Warning devices.

    violationRecord 9769275

    30 CFR 75.208 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord F00F7FC

    1,460.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.