← RIVER VIEW MINE

RIVER VIEW MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection of trailing cables.

    violationRecord 5044126

    30 CFR 75.606 · $151.00 proposed penalty

  2. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5044007

    30 CFR 75.1731(a) · $697.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5044006

    30 CFR 75.1731(a) · $209.00 proposed penalty

  4. Handling of materials

    accidentRecord 220252100002

    Days away from work only

    Accident narrative

    The rock duster was dusting the belt line when EE had carried the dust hose back to the duster, EE felt sharp pain in EE's back. Started missing work on 07/22/2025.

  5. Fall of roof or back

    accidentRecord 220252100001

    Days away from work only

    Accident narrative

    Roof bolter operator was swinging out to install the rib pin when two rocks fell hitting the operator in the back and the left leg. Roof bolter started missing work on 7/22/2025 for inflammation.

  6. Machinery and equipment; operation and maintenance.

    violationRecord 9769852

    30 CFR 75.1725(a) · $151.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 9769851

    30 CFR 75.503 · $245.00 proposed penalty

  8. Protection of trailing cables.

    violationRecord 5044005

    30 CFR 75.606 · $193.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 9769731

    30 CFR 75.1725(a) · $193.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9769850

    30 CFR 75.400 · $288.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 9769849

    30 CFR 75.380(d)(7)(vii)(A) · $151.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 9769730

    30 CFR 75.1722(b) · Significant and substantial (S&S) · $959.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9769729

    30 CFR 75.1731(a) · $151.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 9769728

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  15. Communications facilities; refuge alternatives.

    violationRecord 9769727

    30 CFR 75.1600-3(a)(2) · $193.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 9760525

    30 CFR 75.517 · Significant and substantial (S&S) · $592.00 proposed penalty

  17. Inspection of fire suppression devices.

    violationRecord 5044123

    30 CFR 75.1107-16-b · $151.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5044122

    30 CFR 75.503 · $151.00 proposed penalty

  19. Violation — cited standard not reported

    violationRecord 5044003

    $233.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F00EA1E

    103(i) · 6.5 on-site hours reported

  21. Mine ventilation plan; submission and approval.

    violationRecord 5044002

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 9760524

    30 CFR 75.512 · $226.00 proposed penalty

  23. Methane monitors.

    violationRecord 5044119

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 9769726

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 9760523

    30 CFR 75.202(a) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.