Red Ash Mine No. 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Status change reports.
30 CFR 70.212(a) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Cable fittings; suitability.
30 CFR 77.505 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Main mine fan examinations and records.
30 CFR 75.312(g)(1) · $151.00 proposed penalty
Flammable liquids; storage.
30 CFR 77.1103(d) · $209.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(b) · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Regular Safety and Health Inspection
58.3 on-site hours reported
Health Technical Investigation
5.3 on-site hours reported
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $165.00 proposed penalty
Multi-gas detectors.
30 CFR 75.1714-7(a) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Weekly examination.
30 CFR 75.364(h) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.