← Prairie Eagle-Underground

Prairie Eagle-Underground safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5016924

    30 CFR 75.1731(a) · $245.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 5016923

    30 CFR 75.503 · $432.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5016525

    30 CFR 75.512 · $177.00 proposed penalty

  4. Non-Fatal Accident Investigation

    inspectionRecord F000587

    7.8 on-site hours reported

  5. Violation — cited standard not reported

    violationRecord 5016842
  6. Ventilation controls.

    violationRecord 5016922

    30 CFR 75.333(h) · $226.00 proposed penalty

  7. Roof control plan.

    violationRecord 5016844

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  8. Roof control plan.

    violationRecord 5016843

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  9. Roof control plan.

    violationRecord 5016921

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5016920

    30 CFR 75.503 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  11. Permanent splicing of trailing cables.

    violationRecord 5016841

    30 CFR 75.604(b) · $883.00 proposed penalty

  12. On-shift examination.

    violationRecord 5016919

    30 CFR 75.362(d)(3)(ii) · $151.00 proposed penalty

  13. Warning devices.

    violationRecord 5016918

    30 CFR 75.208 · $226.00 proposed penalty

  14. On-shift examination.

    violationRecord 5016840

    30 CFR 75.362(d)(3)(ii) · Significant and substantial (S&S) · $592.00 proposed penalty

  15. Permanent splicing of trailing cables.

    violationRecord 5016839

    30 CFR 75.604(b) · $883.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5016838

    30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  17. Methane monitors.

    violationRecord 5016524

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5016917

    30 CFR 75.503 · $432.00 proposed penalty

  19. Permissible electric face equipment; maintenance.

    violationRecord 5016916

    30 CFR 75.503 · $432.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F01B410

    103(i) · 7.5 on-site hours reported

  21. Methane monitors.

    violationRecord 5016523

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  22. On-shift examination.

    violationRecord 5016915

    30 CFR 75.362(d)(3)(ii) · Significant and substantial (S&S) · $592.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 5016914

    30 CFR 75.512 · $432.00 proposed penalty

  24. Roof control plan.

    violationRecord 5016913

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 5016522

    30 CFR 75.604(b) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.