← PANTHER MINE

PANTHER MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6973663

    103(i) · 10.0 on-site hours reported

  2. Spot Inspections

    inspectionRecord 6973658

    103(i) · 9.0 on-site hours reported

  3. Protection from falls of roof, face and ribs.

    violationRecord 9821369

    30 CFR 75.202(a) · $151.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 9821368

    30 CFR 75.503 · $151.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9821367

    30 CFR 75.1731(b) · $151.00 proposed penalty

  6. Installation of high-voltage transmission cables.

    violationRecord 9772878

    30 CFR 75.807 · $165.00 proposed penalty

  7. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9821366

    30 CFR 75.1911(i) · $151.00 proposed penalty

  8. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9821365

    30 CFR 75.1910(j) · $151.00 proposed penalty

  9. Maintenance of diesel-powered equipment.

    violationRecord 9821364

    30 CFR 75.1914(a) · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9821363

    30 CFR 75.400 · $151.00 proposed penalty

  11. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9821362

    30 CFR 75.1909(b)(5) · $151.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 9821361

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  13. Escapeways; bituminous and lignite mines.

    violationRecord 9821360

    30 CFR 75.380(d)(7)(v) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F000DF2

    103(i) · 6.0 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 9772877

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9779760

    30 CFR 75.370(a)(1) · $177.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9779759

    30 CFR 75.370(a)(1) · $165.00 proposed penalty

  18. Smoking; prohibition.

    violationRecord 8853265

    30 CFR 75.1702 · $1,431.00 proposed penalty

  19. Fire suppression devices; approved components; installation requirements.

    violationRecord 9775422

    30 CFR 75.1107-3(d) · $151.00 proposed penalty

  20. Electric equipment and circuits; overload and short circuit protection.

    violationRecord 9775421

    30 CFR 75.518 · $151.00 proposed penalty

  21. Fire suppression devices; approved components; installation requirements.

    violationRecord 9775420

    30 CFR 75.1107-3(d) · $151.00 proposed penalty

  22. Roof control plan.

    violationRecord 9772875

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 9772874

    30 CFR 75.1722(a) · $151.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F000DF1

    103(i) · 4.0 on-site hours reported

  25. Regular Safety and Health Inspection

    inspectionRecord F000DEE

    321.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.