← PANTHER MINE

PANTHER MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5080037

    30 CFR 75.503 · $398.00 proposed penalty

  2. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5088337

    30 CFR 75.1909(c)(4) · $151.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5086079

    30 CFR 75.512 · $177.00 proposed penalty

  4. Atmospheric monitoring systems.

    violationRecord 5086078

    30 CFR 75.351(c)(7) · $151.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F02117A

    103(i) · 10.0 on-site hours reported

  6. Communications facilities; refuge alternatives.

    violationRecord 5086077

    30 CFR 75.1600-3(a)(2) · $151.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5086076

    30 CFR 75.1731(a) · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F0195F5

    103(i) · 6.0 on-site hours reported

  9. Spot Inspections

    inspectionRecord F021175

    103(i) · 8.5 on-site hours reported

  10. Electric wiring and equipment; installation and maintenance.

    violationRecord 5086070

    30 CFR 77.516 · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord 6973700

    103(i) · 5.0 on-site hours reported

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5086069

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5086068

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5086067

    30 CFR 75.1731(a) · $151.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F014A04

    103(i) · 5.5 on-site hours reported

  16. Mine ventilation plan; submission and approval.

    violationRecord 5086066

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5086065

    30 CFR 75.380(d)(7)(v) · $151.00 proposed penalty

  18. Roof control plan.

    violationRecord 5086064

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord 6973699

    252.5 on-site hours reported

  20. Spot Inspection

    inspectionRecord 6973698

    4.0 on-site hours reported

  21. Spot Inspection

    inspectionRecord F003CEE

    10.0 on-site hours reported

  22. Spot Inspections

    inspectionRecord F00548F

    103(i) · 8.0 on-site hours reported

  23. Spot Inspections

    inspectionRecord F00548E

    103(i) · 7.0 on-site hours reported

  24. Maintenance of incombustible content of rock dust.

    violationRecord 5085603

    30 CFR 75.403 · $151.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5085225

    30 CFR 75.512 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.