PANTHER EAGLE MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Violation — cited standard not reported
$215.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $366.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(2) · $151.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $288.00 proposed penalty
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(2) · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $288.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $398.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
A non-injury roof fall was discovered on No. 4 Conveyor Belt/Track; No. 34 break. Spad 4419 in the scoop road adjacent to the fall is the nearest spad. Fall measured approximately 55 feet long x 18 feet wide x 4 feet high.
Non-Injury Accident Investigation
7.8 on-site hours reported
Violation — cited standard not reported
Ventilation controls.
30 CFR 75.333(h) · $193.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Machinery
Days away from work only
Accident narrative
Employee bent a roof bolt to get it installed in the roof. As the employee was bending the bolt back to get it aligned with the drill chuck EE's rescuer hit the rotation lever resulting in EE's right hand getting caught in the bolt.
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $313.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.