← OHIO COUNTY MINE

OHIO COUNTY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Travelways at surface installations.

    violationRecord 9932710

    30 CFR 77.205(b) · $366.00 proposed penalty

  2. Weekly examination.

    violationRecord 9933240

    30 CFR 75.364(d) · $818.00 proposed penalty

  3. Roof control plan.

    violationRecord 9932899

    30 CFR 75.220(a)(1) · $273.00 proposed penalty

  4. Roof control plan.

    violationRecord 9932898

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  5. Smoking prohibition.

    violationRecord 9932709

    30 CFR 77.1711 · $151.00 proposed penalty

  6. Accumulations of combustible materials.

    violationRecord 9932708

    30 CFR 77.1104 · $151.00 proposed penalty

  7. Travelways at surface installations.

    violationRecord 9932707

    30 CFR 77.205(b) · $151.00 proposed penalty

  8. Ventilation controls.

    violationRecord 9930757

    30 CFR 75.333(h) · $288.00 proposed penalty

  9. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F00AAC4

    2.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F006547

    103(i) · 7.0 on-site hours reported

  11. Permissible electric face equipment; maintenance.

    violationRecord 9932897

    30 CFR 75.503 · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9932896

    30 CFR 75.400 · $226.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 9932895

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9932894

    30 CFR 75.400 · $226.00 proposed penalty

  15. Accumulations of combustible materials.

    violationRecord 9932706

    30 CFR 77.1104 · Significant and substantial (S&S) · $549.00 proposed penalty

  16. Requirement for container labels.

    violationRecord 9932705

    30 CFR 47.41(a) · $151.00 proposed penalty

  17. Storage of materials.

    violationRecord 9932704

    30 CFR 77.208(d) · $151.00 proposed penalty

  18. Storage of materials.

    violationRecord 9932703

    30 CFR 77.208(e) · $245.00 proposed penalty

  19. Handling of materials

    accidentRecord 220250350002

    Days away from work only

    Accident narrative

    Employee was spotting a belt move when EE's right ring finger got caught between a roller and cradle. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.

  20. Spot Inspections

    inspectionRecord F006546

    103(i) · 6.0 on-site hours reported

  21. Mine ventilation plan; submission and approval.

    violationRecord 9932893

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 9932892

    30 CFR 75.202(a) · $398.00 proposed penalty

  23. Permissible exposure level.

    violationRecord 9932891

    30 CFR 62.130(a) · $165.00 proposed penalty

  24. Permissible exposure level.

    violationRecord 9932890

    30 CFR 62.130(a) · $165.00 proposed penalty

  25. Escapeway maps.

    violationRecord 9932889

    30 CFR 75.1505(b) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.