OHIO COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Violation — cited standard not reported
$407.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $366.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Ventilation Technical Investigation
7.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $549.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(4) · $245.00 proposed penalty
Health Technical Investigation
15.8 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $398.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Other safeguards.
30 CFR 75.1403 · $366.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $165.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was attempting to uncouple the slag car from the trip of cars. The chain was not attached to the coupler when attempting to cut the cars and EE's hand slipped off the handle. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.