NO. 77 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 6.0 on-site hours reported
Spot Inspections
103(i) · 8.0 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $165.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Violation — cited standard not reported
Non-Injury Accident Investigation
16.0 on-site hours reported
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
30 CFR 75.363(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $165.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.