← NO. 77

NO. 77 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Roof control plan.

    violationRecord 9778984

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5084277

    30 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084276

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F010776

    280.8 on-site hours reported

  5. Spot Inspections

    inspectionRecord F0115F0

    103(i) · 6.0 on-site hours reported

  6. Permissible electric face equipment; maintenance.

    violationRecord 5084615

    30 CFR 75.503 · $226.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F000706

    103(i) · 6.0 on-site hours reported

  8. Spot Inspection

    inspectionRecord F0115EC

    28.5 on-site hours reported

  9. Trailing cables for mobile equipment, ground wires, and ground check wires.

    violationRecord 5080021

    30 CFR 75.906 · $165.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5084614

    30 CFR 75.380(f)(5)(ii) · $165.00 proposed penalty

  11. Permanent splicing of trailing cables.

    violationRecord 5084017

    30 CFR 75.604(b) · $165.00 proposed penalty

  12. Roof testing and scaling.

    violationRecord 5084016

    30 CFR 75.211(c) · Significant and substantial (S&S) · $818.00 proposed penalty

  13. Electric equipment; examination, testing, and maintenance.

    violationRecord 5080018

    30 CFR 77.502 · $165.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5084442

    30 CFR 75.333(h) · $165.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5084437

    30 CFR 75.400 · $398.00 proposed penalty

  16. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5084436

    30 CFR 75.1101-10 · $165.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5084435

    30 CFR 75.400 · $398.00 proposed penalty

  18. Permanent splicing of trailing cables.

    violationRecord 5084015

    30 CFR 75.604(b) · $165.00 proposed penalty

  19. Roof control plan.

    violationRecord 5084014

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5084433

    30 CFR 75.400 · $398.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5084432

    30 CFR 75.400 · $398.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 9779905

    30 CFR 72.630(b) · $267.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 9779904

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5084013

    30 CFR 75.400 · $398.00 proposed penalty

  25. Handtools (nonpowered)

    accidentRecord 220260300015

    Days away from work only

    Accident narrative

    EE's rail motor EE was operating had de-railed. EE used a jack and a bar to put the ride back on the track. Upon doing so, the jack turned over causing the bar to strike EE on the right cheek area of EE's face. The ride went back on the track at that time and EE gathered up all EE's tools and went to the outside to be checked out for precaution.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.