← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 9822493

    30 CFR 75.512 · $151.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 9824104

    30 CFR 75.400 · $642.00 proposed penalty

  3. Other safeguards.

    violationRecord 9828868

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 9828867

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 9825872

    30 CFR 75.517 · $755.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 9825871

    30 CFR 75.517 · $755.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9752217

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  8. Spot Inspections

    inspectionRecord 6974479

    103(i) · 7.0 on-site hours reported

  9. Diesel-powered equipment intended for use in underground coal mines.

    violationRecord 9824103

    30 CFR 75.1907(b)(3) · $226.00 proposed penalty

  10. Diesel-powered equipment intended for use in underground coal mines.

    violationRecord 9824102

    30 CFR 75.1907(b)(3) · $226.00 proposed penalty

  11. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 9825870

    30 CFR 75.1714-3(a) · $755.00 proposed penalty

  12. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9825869

    30 CFR 75.1911(a)(2) · $226.00 proposed penalty

  13. Condition and examination of firefighting equipment.

    violationRecord 9822492

    30 CFR 75.1100-3 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 9822491

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9822490

    30 CFR 75.400 · $465.00 proposed penalty

  16. Roof control plan.

    violationRecord 9824101

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9828866

    30 CFR 75.202(a) · $336.00 proposed penalty

  18. Ventilation controls.

    violationRecord 9828865

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord 6974478

    103(i) · 7.5 on-site hours reported

  20. Mine map.

    violationRecord 9769805

    30 CFR 75.1200(c) · $151.00 proposed penalty

  21. Permanent splicing of trailing cables.

    violationRecord 9769073

    30 CFR 75.604(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 9825867

    30 CFR 75.503 · $288.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9825866

    30 CFR 75.400 · $432.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9825865

    30 CFR 75.400 · $432.00 proposed penalty

  25. Other safeguards.

    violationRecord 9828864

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.