← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5063031

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5063030

    30 CFR 75.202(a) · $398.00 proposed penalty

  3. Condition and examination of firefighting equipment.

    violationRecord 9827154

    30 CFR 75.1100-3 · $226.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 9756574

    30 CFR 75.400 · $432.00 proposed penalty

  5. Multi-gas detectors.

    violationRecord 9756573

    30 CFR 75.1714-7(a) · $151.00 proposed penalty

  6. Spot Inspections

    inspectionRecord 6974199

    103(i) · 9.5 on-site hours reported

  7. Permissible electric face equipment; maintenance.

    violationRecord 9827153

    30 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 9827152

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5063029

    30 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  10. Ventilation controls.

    violationRecord 5063028

    30 CFR 75.333(b)(3) · $226.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 5063027

    30 CFR 75.380(d)(1) · $226.00 proposed penalty

  12. Other safeguards.

    violationRecord 5061836

    30 CFR 75.1403 · $336.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 5061835

    30 CFR 75.360(g) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord 6974198

    103(i) · 10.0 on-site hours reported

  15. Permanent splicing of trailing cables.

    violationRecord 9827151

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  16. Roof control plan.

    violationRecord 9827150

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  17. Escapeway maps.

    violationRecord 9827149

    30 CFR 75.1505(b) · $226.00 proposed penalty

  18. Maintenance of incombustible content of rock dust.

    violationRecord 9827148

    30 CFR 75.403 · $288.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 9827147

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  20. Escapeways; bituminous and lignite mines.

    violationRecord 9827146

    30 CFR 75.380(d)(7)(vi) · $398.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9827145

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 9756572

    30 CFR 75.400 · $432.00 proposed penalty

  23. Spot Inspections

    inspectionRecord 6974590

    103(i) · 6.0 on-site hours reported

  24. Protection from falls of roof, face and ribs.

    violationRecord 9827143

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9756571

    30 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.