← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspection

    inspectionRecord F026597

    5.5 on-site hours reported

  2. Inspection of fire suppression devices.

    violationRecord 5192677

    30 CFR 75.1107-16(b) · $245.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5061983

    30 CFR 75.503 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Power wires; support.

    violationRecord 5190949

    30 CFR 75.516 · $432.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5190948

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 5061982

    30 CFR 75.512 · $267.00 proposed penalty

  7. Drill dust control at underground areas of underground mines.

    violationRecord 5061981

    30 CFR 72.630(b) · $177.00 proposed penalty

  8. Protection of trailing cables.

    violationRecord 5061980

    30 CFR 75.606 · $151.00 proposed penalty

  9. Roof control plan.

    violationRecord 5061979

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5192222

    30 CFR 75.400 · $465.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F026596

    103(i) · 7.3 on-site hours reported

  12. Accumulation of combustible materials.

    violationRecord 5192817

    30 CFR 75.400 · $504.00 proposed penalty

  13. Roof control plan.

    violationRecord 5192816

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  14. Permanent splicing of trailing cables.

    violationRecord 5192676

    30 CFR 75.604(b) · $245.00 proposed penalty

  15. Methane monitors.

    violationRecord 5192675

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5193606

    30 CFR 75.333(c)(3) · $245.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5193605

    30 CFR 75.400 · $465.00 proposed penalty

  18. Other safeguards.

    violationRecord 5193604

    30 CFR 75.1403 · $267.00 proposed penalty

  19. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5193603

    30 CFR 75.1107-9(a)(1) · $245.00 proposed penalty

  20. Other safeguards.

    violationRecord 5193602

    30 CFR 75.1403 · $267.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5193601

    30 CFR 75.400 · $465.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5190947

    30 CFR 75.503 · $336.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5190946

    30 CFR 75.400 · $504.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5192674

    30 CFR 75.202(a) · $504.00 proposed penalty

  25. Emergency Response Plan; refuge alternatives.

    violationRecord 5192673

    30 CFR 75.1507(a)(11)(ii) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.