NO. 2 GAS safety activity
MSHA violations, accident reports and inspections.
Safety activity
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $818.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,968.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $818.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $336.00 proposed penalty
Regular Safety and Health Inspection
303.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $883.00 proposed penalty
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $366.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $165.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(e) · $165.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
3.5 on-site hours reported
Boreholes in advance of mining.
30 CFR 75.388(a)(2) · $4,047.00 proposed penalty
Boreholes in advance of mining.
30 CFR 75.388(c) · $4,047.00 proposed penalty
Spot Inspection
7.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $2,503.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.