Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $245.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $245.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Mine ventilation map.
30 CFR 75.372(b)(12) · $151.00 proposed penalty
Machinery
Days away from work only
Accident narrative
Employee was operating a Continuous Miner in the No. 8 Right, when a piece of rock 9'x3'x6" fell from between the outside roof bolt and mine rib striking their right leg.
Regular Safety and Health Inspection
234.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.